"> AEG Power Solutions / 3W Power (Germany) Marine UPS Series
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 1 verified suppliers & service companies for AEG Power Solutions / 3W Power (Germany) in the Maritime Network Find suppliers →
AEG Power Solutions / 3W Power (Germany)

Marine UPS Series

AEG Power Solutions is a German UPS manufacturer, particularly prevalent on German naval ships and commercial ships. Marine UPS systems supply critical navigation and communication systems during power failure. SOLAS requires an emergency power battery for at least 36 hours for certain systems.

1-200 kVA
Capacity
230V/400V AC
Voltage
Uninterruptible Power Supply
Medium

Components & Design

Component data being added…

Technical Data

type Online Double-Conversion UPS (Marine)
variant count approx 3
period start year 1990
drive type Electric
construction IGBT inverter, battery bank, static switch

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Battery degradation from age/temperature (replace every 3-5 years)
Inverter IGBT module failure from voltage spikes
Fan failure causing overheating
Static switch malfunction
Capacitor aging in DC link

Service & Maintenance

Battery replacement every 3-5 years. Battery test quarterly. Inverter/rectifier check annually. Fan replacement every 3-5 years. UPS load test annually.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

AEG Power Solutions. Lead time: 2-4 weeks. Batteries: widely available.
Equipment Model #37964 · ✓ still in production