"> Rapp Marine Group (Norway) Rapp Hydema Mooring Winch
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 12 verified suppliers & service companies for Rapp Marine Group (Norway) in the Maritime Network Find suppliers →
Rapp Marine Group (Norway)

Rapp Hydema Mooring Winch

Rapp Marine Group (Bodø, Norway) is a Norwegian deck machinery manufacturer whose Rapp Hydema brand (formerly Hydema, Åndalsnes) produces hydraulic mooring winches for tugs, ferries, offshore supply vessels and fishing vessels. Particularly strong in the Norwegian coastal shipping and fishing market.

Rapp Marine Group (Norway) Rapp Hydema Mooring Winch
Pull 50-300 kN
Capacity
Mooring Lines
Medium

Inspector Detail

Common issues

  • Hydraulic system leakage at the motor, valves, or hose connections
  • Brake band/disc wear reducing holding capacity
  • Wire rope or drum wear, including poor spooling from an incorrect fleet angle
  • Clutch mechanism wear affecting drum-to-gearbox engagement
  • Gearbox oil contamination or wear from seawater ingress
  • Corrosion of the drum, gypsy, and structural mounting from the marine environment

Inspection checklist

  • Check hydraulic oil level, condition (water contamination), and filter status
  • Inspect brake band/disc lining thickness and test holding capacity
  • Check wire rope condition (broken wires, corrosion, lubrication) against the applicable rope standard
  • Verify clutch engagement/disengagement operation
  • Sample gearbox oil for water and metal content
  • Check drum and shaft bearing condition and lubrication
  • Test the auto-tension/render-recover function, if fitted
  • Inspect foundation bolts and structural mounting for cracking or corrosion
  • Function-test the emergency/manual brake release

Service intervals

Hydraulic oil change typically every 2,000-4,000 running hours or annually, per the maker's schedule
Gearbox oil change annually, or per running hours per the maker's manual
Brake lining inspection every 6-12 months, condition-based
Wire rope inspection every 3-6 months per the rope maker's/class guidance
Brake holding capacity/render test per class/flag requirement for mooring winches

Typical wear limits

Brake lining thickness renew at the maker's minimum-thickness mark, commonly around 50% of new thickness - confirm against Rapp Hydema's own limit
Wire rope discard criteria per the applicable wire rope standard (broken-wire count, diameter reduction) - confirm against the rope's own class and the class society's guidance

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Brake band/disc lining sets
  • Hydraulic motor seal kits
  • Clutch friction plates/dog clutch components
  • Hydraulic hoses and fittings
  • Gearbox seals/gaskets
  • Wire rope sized to the drum

Safety

  • Snap-back/whip hazard if a loaded wire rope fails - keep clear of the bight and snap-back zone
  • Stored hydraulic pressure must be isolated and relieved before maintenance
  • Brake holding capacity must be verified - inadequate render control can cause uncontrolled payout under load
  • Crush and entanglement hazard at the drum and fairlead during operation

Class survey

Mooring winches fall under the deck machinery survey scope; class typically expects a brake holding/render test at the defined interval, wire rope certification/inspection records, and confirmation that the emergency release arrangement functions correctly.

Estimated lifetime: Hydraulic mooring winches in this size range commonly remain in service 20-25+ years with periodic brake, seal, and wire rope renewal; the frame and drum are normally the longest-lived components, with the gearbox and hydraulic components seeing the most wear.

Components & Design

Component data being added…

Technical Data

type Single/Double Drum Mooring Winch (Hydraulic)
variant count approx 4
period start year 1950
drive type Hydraulic
construction Welded steel, hydraulic motor, band brake

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Hydraulic motor seal leakage
Band brake wear
Hydraulic hose deterioration

Service & Maintenance

Hydraulic system maintenance critical. Oil analysis annually.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Rapp Marine (Bodø, Norway). Lead time: 3-5 weeks.
Equipment Model #37831 · ✓ still in production