"> Wärtsilä / Lips (Finland/Netherlands) WTT Series (Transverse Tunnel Thruster)
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 66 verified suppliers & service companies for Wärtsilä / Lips (Finland/Netherlands) in the Maritime Network Find suppliers →
Wärtsilä / Lips (Finland/Netherlands)

WTT Series (Transverse Tunnel Thruster)

The Wärtsilä/LIPS WTT series is an electric transverse tunnel bow thruster with a controllable pitch (CP) propeller, epicyclic gear and a steel tunnel, offering 360° continuous steering for high‑thrust maneuvering.

50-4,000 kN thrust
Capacity
Seawater
Medium

Components & Design

Component data being added…

Technical Data

type Tunnel Bow/Stern Thruster (FP/CP)
variant count approx 6
period start year 1980
drive type Electric
construction CP propeller, epicyclic gear, steel tunnel

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Propeller-Blätter: Erosion, Korrosion, Kantenschäden, Verschleißmuster

Perform visual inspection and NDT (non-destructive testing) according to OEM and classification society standards. Polishing in combination with edge damage repair increases operating efficiency by 2-5%. Check for pitting, erosion patterns and corrosion spots; document severe pitting areas.

Propeller blade foot seals: wear, leakage, water ingress

5-year overhaul: Disassemble and inspect all seals. 10-year overhaul: Complete replacement of blade foot O-rings. Check for water penetration in jet thruster assembly. Seals are critical for system protection.

Wellendichtungen (Shaft Seals): Abnutzung, Leckage, Austauschbedarf

Measure propeller shaft wear with poker gauge (between last two stern tube seals). Perform complete inspection of tooth clearance, tooth pattern and shaft seals. 5-year overhaul: seal replacement. 10-year overhaul: comprehensive replacement.

Bearings (Roller Bearings): wear, bearing clearance, preload, failure symptoms

5-year overhaul: Check bearing clearance and wear. 10-year overhaul: Complete bearing replacement, reset preload, perform NDT inspection. Check main bearing axial clearance wear with feeler gauge (0.1 mm); maximum wear limit 2 mm. Use Wärtsilä bearing wear measurement system for remote monitoring of propeller shaft shoulder.

Hydrauliksystem: Öl-Verschmutzung (Wasser, Partikel), Filtration, Ölqualität

Check gear oil regularly. At critical wear limits: partial change (bleed-and-feed) or complete oil change. Monitor water content in oil (critical >1000 ppm). Check fine filtration system and redundant filter options. Continuously filter out water ingress. Use all Wärtsilä-approved spare parts. 5-10-year overhaul: Perform oil change and filter maintenance.

Sternguard In-Water Serviceable Seal (IWSS): seal integrity, maintenance possible underwater

Check for oil leakage at outer seal. Inspect inflatable emergency seal and inner rope guard. Fully serviceable underwater without habitat or discharge. Measure seal gap and wear. Check retrofit compatibility with other seal types. Confirm compatibility with EAL and mineral oils.

Type-general inspection and maintenance points for this equipment category — not model-specific.

Service & Maintenance

Gear oil analysis every 1,000 hrs. Propeller inspection at drydock. CP mechanism overhaul every 20,000 hrs. Motor insulation test annually. Tunnel grid inspection at drydock.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Wärtsilä (ehem. Lips, Drunen, Netherlands). Lead time: 3-6 weeks for standard parts. CP hub components: 8-12 weeks.
Equipment Model #37786 · ✓ still in production