"> ALLWEILER (CIRCOR/IDEX) MA / MI Serie
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 3 verified suppliers & service companies for ALLWEILER (CIRCOR/IDEX) in the Maritime Network Find suppliers →
ALLWEILER (CIRCOR/IDEX)

MA / MI Serie

ALLWEILER MA/MI heavy-duty axially-split double-suction pump for high-flow ballast water and main cooling water duties on VLCCs, ULCCs, large bulk carriers. Used since 1975, still produced.

150-4500 m³/h
Capacity
Sea water/ballast
Medium

Components & Design

Component data being added…

Technical Data

pump type Heavy-duty axially-split double-suction centrifugal pump
variant count approx 150
period start year 1975
drive type Electric
construction Cast steel/cast iron casing, bronze/duplex stainless impeller

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Casing split joint gasket leakage after high-load cycling
Double-suction impeller axial-thrust imbalance from one-side wear
Bearing housing oil leakage at high temperature
Coupling element fatigue in heavy-load applications

Service & Maintenance

Casing split joint inspection at every drydock. Bearing oil change every 6 months. Impeller balance check at major overhaul (every 5 years).

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Heavy-duty service: keep casing joint gasket, complete bearing set, coupling elements, packing rings or seal cartridge. Lead time 8-14 weeks for impeller/casing parts.
Equipment Model #37450 · ✓ still in production