"> GEA Westfalia UCD 205
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 3 verified suppliers & service companies for GEA Westfalia in the Maritime Network Find suppliers →
GEA Westfalia

UCD 205

The GEA Westfalia UCD 205 is a high‑speed disc‑type sludge separator for marine fuel oil, featuring a self‑cleaning bowl and splash‑lubricated bearings to continuously remove particulate sludge from heavy fuel before it reaches the engine.

4.0 kW
Power
2 m3/h
Capacity
Oil sludge
Medium

Components & Design

Component data being added…

Technical Data

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Tellerpaket/Bowl Sealing Surfaces Wear

Check polyamide gasket (B) seating parallel in groove via measurements around circumference; Inspect sliding piston sealing surface (A) for wear; Document if remachining is required (up to manufacturer spec)

Spindle Bearing Lubrication & Condition

Verify oil level in central oil bath; Check bearing splash lubrication system function; At 8,000h intervals: measure neck bearing spring lengths; Inspect for discoloration/degradation of lube oil; Motor bearings per manufacturer instruction

Bowl Erosion, Corrosion & Material Integrity

Inspect bowl lock ring, bowl bottom, bowl top for corrosion (flat-spread/pit/crack patterns); Check for mechanical damage in high-diameter outer sections; Under aggressive/high-temp operation: document erosion patterns; Requires bowl disassembly per 16,000-hour maintenance

Drive Coupling & Flat Belt System

Visually inspect flat belt for wear, fraying, cracks; Check centrifugal clutch engagement/disengagement function; Measure belt tension; Check all hydraulic system channels (holes/nozzles/chambers) for blockage; Clean hydraulic orifices during 16,000h service

Centripetal Pump Wear & Hydraulic Leakage

After bowl removal: inspect pump impeller and casing for wear marks; Check all hydraulic flanges, valve glands for oil seepage; Pressure-test hydraulic lines if available; Review for signs of cavitation or blockage in sensing pump

Scheduled Maintenance Intervals Not Met

Verify first service completion at 8,000h/1yr; Check documentation for 16,000h (2yr) and 48,000h (6yr) services; Under unfavorable conditions (aggressive feedstock, high temps, poor product quality): recommend shortened intervals; Replace vibration isolators after 48,000h

Type-general inspection and maintenance points for this equipment category — not model-specific.

Service & Maintenance

Nozzle-type separator; clean nozzles after each sludge batch.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

GEA Westfalia: O-Ring-Satz und Betriebswasserventil an Bord vorhalten. Lead time: 2-6 Wochen je nach Hersteller.
Equipment Model #337 · ✓ still in production