"> Global Davit GmbH W02H.15.01
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 1 verified suppliers & service companies for Global Davit GmbH in the Maritime Network Find suppliers →
Global Davit GmbH

W02H.15.01

The Global Davit GmbH W02H.15.01 is an IMO‑approved, DNV‑listed davit system designed to launch lifeboats or rescue rafts from merchant vessels.

Global Davit GmbH W02H.15.01
Persons capacity per SOLAS certification
Capacity
Crew Evacuation / Safety
Medium

Components & Design

Component data being added…

Technical Data

imo approved True

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

On-Load-Release-Gear (OLRG)

Annual functional test at 1.1 × SWL; after test check locking; inspect for dried paint/contamination/corrosion in lock, thread/shank wear/cracks. 5-year dynamic test. SOLAS III / MSC.402(96).

Drahtseile (Falls/Wire Ropes)

Inspect for kinks, corrosion, strand breakage (>10% over 8d length = replacement), inaccessible sections; correct/certified ropes; if required turn for full inspection; renewal per manufacturer interval.

Bremse (Zentrifugal- + Haltebremse)

Brake pad wear; check lowering speed (SOLAS S=0.4+0.02H, max ~36 m/min); remote release function; brake not blocked by poor maintenance.

Korrosion der Davit-Struktur

Galvanized structure + stainless steel fasteners for pitting/discoloration; NDT of load-bearing structure for cracks; incident RRS Sir David Attenborough 2021 (severe corrosion due to poor maintenance).

Wartungs-Compliance

Planned maintenance complete since installation? Annual + 5-year tests recorded in logbook; manufacturer instructions followed; only authorized personnel (MSC.1/Circ.1205 Rev.1).

Type-general inspection and maintenance points for this equipment category — not model-specific.

Service & Maintenance

Engine test weekly (min. 5 min). Release hook maintenance annually by approved service (SOLAS MSC.402(96)). GRP hull inspection at docking. 5-year basic survey.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Spare parts via Global Davit GmbH or authorized distribution partners. Lead time: 2–6 weeks.

DNV type approval

Verified against the DNV Approval Finder — the certificate below is issued by DNV, not by us.

Certificate
1115514 HH
Open the certificate at DNV →
Equipment Model #3303 · ✓ still in production