K-Bridge BNWAS MK2
The K‑Bridge BNWAS MK2 is a Bridge Navigational Watch Alarm System that monitors the watch‑keeping status of bridge personnel and automatically escalates alarms if no response, ensuring compliance with IMO SOLAS requirements.
Inspector Detail
▸
Common issues
- Motion or activity sensor false triggers or failure to detect, from misalignment or obstruction
- Reset button or panel wear from frequent use
- Backup power or battery degradation affecting alarm function during a power loss
- Software or firmware faults requiring a reset or update
- Escalation stage timing drift away from the configured SOLAS-required intervals
- Wiring or connection faults to the bridge, cabins or public spaces used for the second-stage alarm
Inspection checklist
- Function test of the dormant period timer and full escalation sequence (bridge, then officer's cabin or duty mess, then master's cabin) per SOLAS requirement
- Reset switch operation check from all designated positions
- Backup power supply and battery condition and automatic changeover check
- Alarm audibility confirmation at all required remote locations
- System log review for false alarms or fault history
- Sensor coverage and sensitivity setting review for the actual bridge layout
Service intervals
| Watch-to-watch function test | commonly performed at each change of watch or per the vessel's safety management system |
| Full escalation test | typically monthly or per class/flag requirement - confirm against the vessel's planned maintenance and SOLAS chapter V requirements |
| Backup power/battery check | typically checked every 6-12 months per the maker's manual, with battery renewal per the maker's stated service life |
Critical spares
- Reset unit/push-button panel
- Backup battery pack
- Motion sensor unit
Safety
- BNWAS must not be defeated, disabled, or have its dormant period extended beyond SOLAS-permitted limits, as this removes a watchkeeping safety barrier
- Verify the alarm reaches every required escalation point - crew safety depends on the full escalation chain working, not just the bridge alarm
- Coordinate function tests with the bridge team so a live escalation test is not mistaken for an actual emergency, and restore the system to normal operating mode immediately afterward
Class survey
BNWAS is a SOLAS chapter V mandatory item; class and flag surveys typically require a documented function test of the full alarm and escalation chain, verification that the dormant period setting is compliant, and confirmation the system cannot be defeated - maintain test records for survey.
Components & Design
Component data being added…
Technical Data
🤖 Ask about this model
One free question — answered like a marine engineer. No account needed.
Common failures & inspection points
Service & Maintenance
Maintenance per manufacturer manual and classification society requirements. Annual inspection at class survey. Stock spare parts per manufacturer specification.
Suppliers & Spare Parts
Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.
📄 Request sourcing links & documentsCases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.
Start free trial →Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.
Maritime Network →