Library› Engine Room› Pumps› Main Cooling Seawater Pump (Centrifugal)› Napier Turbochargers - A Division of Wabtec UK Ltd. TS1, TS2
Napier Turbochargers - A Division of Wabtec UK Ltd.

TS1, TS2

Main Cooling Seawater Pump (Centrifugal) · Pumps

Data sheet on file · key figures checked
Seawater / Freshwater / OilMedium

Napier Turbochargers design, manufacture, market and support high efficiency Industrial Turbochargers for Marine Propulsion, Rail Traction and Power Generation.

Related models

Also in Main Cooling Seawater Pump (Centrifugal).

Other models of the same equipment type, Napier Turbochargers - A Division of Wabtec UK Ltd. first.

Service

Service notes.

What our service work and the manufacturer documentation say about keeping this model running.

Service notes

Mechanical seal every 8,000-12,000 hours. Impeller inspection at drydock. Shaft bearings every 15,000-20,000 hours. Check coupling alignment annually. Vibration measurement quarterly.

Inspection

Common failures & inspection points

Inspection

Inspector Detail

Common issues

  • Mechanical seal leakage, typically after 8,000-12,000 running hours.
  • Impeller erosion due to cavitation, often linked to insufficient NPSH or prolonged low-flow operation.
  • Shaft bearing wear, commonly observed after 15,000-20,000 operating hours.
  • Coupling misalignment leading to excessive vibration and premature bearing/seal failure.
  • Motor overheating or insulation breakdown due to continuous overload or poor ventilation.
  • Clogging of suction strainer or impeller passages, reducing flow and efficiency.
  • Excessive noise or vibration from the pump unit, indicating internal wear or imbalance.

Inspection checklist

  • Check mechanical seal for any signs of leakage (drips, streaks) and ensure drain line is clear.
  • Monitor bearing temperatures (manual touch or IR thermometer) and listen for unusual noises (grinding, squealing).
  • Verify coupling alignment annually using feeler gauges or laser alignment tool; inspect coupling elements for wear.
  • Perform quarterly vibration measurements on pump and motor bearings, comparing to baseline data.
  • Inspect impeller for erosion, pitting, or foreign object damage during dry-docking or major overhaul.
  • Confirm suction and discharge pressure gauge readings are within normal operating parameters.
  • Check motor current draw against nameplate FLA and ensure cooling fins are clear of debris.
  • Verify integrity of foundation bolts and general pump/motor mounting for looseness or corrosion.
  • Inspect casing for external corrosion, cracks, or signs of previous repairs.

Service intervals

Mechanical Seal Replacement/Overhaul8,000-12,000 running hours
Impeller InspectionDuring dry-docking or major overhaul (approx. 20,000-30,000 hours)
Shaft Bearing Replacement/Overhaul15,000-20,000 running hours
Coupling Alignment CheckAnnually
Vibration MeasurementQuarterly
Motor Winding Insulation TestEvery 2-3 years or during major overhaul

Typical wear limits

Mechanical Seal LeakageNo visible drips; slight misting acceptable for some types, but continuous stream indicates failure.
Impeller Erosion/PittingDepth exceeding 1-2mm or significant imbalance. Manufacturer's specific limits apply.
Shaft Bearing PlayRadial play exceeding 0.05-0.1mm (depending on bearing size) or axial play outside manufacturer's specification.
Shaft Runout (at seal/bearing journals)Typically less than 0.02-0.05mm Total Indicated Runout (TIR).
Coupling MisalignmentParallel offset < 0.05mm, Angular misalignment < 0.05mm per 100mm of coupling diameter.
Vibration LevelsISO 10816-3 Zone C (unrestricted long-term operation) or D (damage likely) for pump/motor casing.

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Complete mechanical seal kit (stationary and rotating faces, springs, O-rings)
  • Set of shaft bearings (typically two per pump, e.g., deep groove ball bearings)
  • Impeller (if cavitation is a persistent issue or for critical applications)
  • Coupling elements/inserts (e.g., rubber spiders, flexible discs)
  • Full set of casing gaskets and O-rings
  • Shaft sleeve (if applicable, often part of the seal area)

Safety

  • Ensure proper Lock-Out/Tag-Out (LOTO) procedures are followed before any maintenance or inspection.
  • Beware of rotating machinery; ensure all guards are in place during operation.
  • High-pressure seawater leaks can cause injury or damage to electrical components; wear appropriate PPE.
  • Electrical hazards from the motor and control panel; ensure proper grounding and insulation.
  • Hot surfaces (motor casing, bearings) during operation; allow cooling before handling.

Class survey

Surveyors typically check for general operational integrity: pump starts and stops correctly, no excessive noise or vibration, no significant leakage from seals or flanges. They will verify discharge pressure and flow (if instrumentation is available). Foundation security and proper guarding of rotating parts are also inspected. Maintenance records, particularly for critical components like seals and bearings, and the availability of essential spare parts (e.g., mechanical seal kit) are usually reviewed. Emergency stop functionality, if integrated, may also be tested. Overall cleanliness and condition of the pump and its surrounding area are noted.

Estimated lifetime: 40,000-60,000 hours before major overhaul (full strip-down, shaft inspection, casing refurbishment), with total service life often exceeding 100,000 hours with proper maintenance and component replacement.

Spares

Replacement Parts

Spare parts notes

Napier Turbochargers - A Division of Wabtec UK Ltd.: Ersatzteile per Hersteller-Ersatzteilliste. Mechanische Dichtungen und Laufräder an Bord vorhalten. Lead time: 2-6 Wochen je nach Hersteller.

Need this part?

Request a quote for this model.

Free of charge — we forward your request to qualified suppliers for Napier Turbochargers - A Division of Wabtec UK Ltd. equipment from our network of over 114,000 maritime companies.

Makers and authorised dealers rarely quote marine equipment without the vessel. With these details we usually come back with prices; without them we have to ask first, which costs a few days. If you cannot share the vessel, a photo of the equipment’s rating plate does the same job — send it as a reply to our confirmation e-mail.

Your contact details are not published. No account required.
By manufacturer AFRISOWISKASwagelokEndress+HauserAlfa Laval S.p.A.MAN Energy SolutionsWärtsiläABB MarineAlfa LavalMacGregorNovenco MarineseimihanlaimsDESMICarrier MarineAll manufacturersSpare parts by equipmentNew here? Create a free account Can't read the plate? Try the nameplate scanner More like TS1, TS2
Would you like to know more?

One person answers within 24 hours on working days.

Tell us what you need for this Napier Turbochargers - A Division of Wabtec UK Ltd. TS1, TS2 — a part, a service call, a second opinion. Are you Napier Turbochargers - A Division of Wabtec UK Ltd.? Claim this brand page.

Service engineer? Write the day report for this TS1, TS2 in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →

Frequently asked

Three things people ask first.

Is this model's data free?

Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.

Can you find a part for this exact model?

Yes. Tell us the manufacturer, the model and what you need — our desk asks the right suppliers from a network of over 114,000 companies and comes back with a quote or a sourcing plan.

The specifications look wrong — what now?

Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.