Turbocharger · Turbochargers
The MAN Energy Solutions TCA series is an axial‑flow marine turbocharger that boosts main engine performance with a high‑speed turbine and radial compressors, featuring DLC‑coated hydrodynamic bearings for extended service intervals.
What our service work and the manufacturer documentation say about keeping this model running.
Servicing per the manufacturer's manual and classification society requirements. Annual inspection at class survey. Stock spare parts as specified by the manufacturer.
| Visual inspection (routine rounds) | Daily/Weekly |
|---|---|
| Compressor water washing | 250-500 operating hours (as needed) |
| Turbine water washing | 500-1000 operating hours (as needed) |
| Bearing inspection/replacement | 4,000-8,000 operating hours |
| Rotor inspection/minor overhaul | 12,000-18,000 operating hours |
| Major overhaul (complete rotating assembly) | 24,000-36,000 operating hours or 5-7 years |
| Annual inspection | As per Class Survey requirements |
| Rotor axial play | 0.15 - 0.35 mm (new), wear limit typically +0.1 to +0.2 mm over new value, or as per manufacturer's manual. |
|---|---|
| Rotor radial play | 0.05 - 0.15 mm (new), wear limit typically +0.05 to +0.1 mm over new value, or as per manufacturer's manual. |
| Bearing clearances | Specific to model, typically 0.05-0.15mm for journal bearings. Wear limit often +0.05mm to +0.1mm. |
| Compressor wheel blade tip clearance | Specific to model, typically 0.5-1.5 mm. Wear limit often +0.2mm. |
| Turbine blade thickness | Minimum thickness as specified in manufacturer's manual (check for erosion). |
| Oil inlet pressure | 1.5 - 3.0 bar (typical operating range, check manual for specific model). |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
Class surveyors typically verify maintenance records and logbook entries, visually inspect for external damage, leaks, and corrosion, check insulation integrity, confirm proper functioning of safety devices (e.g., overspeed trip), assess vibration levels, inspect air intake filters, and confirm availability of critical spare parts. During major surveys, internal inspection of compressor and turbine components may be required if the unit is opened for maintenance.
Estimated lifetime: 24,000-36,000 hours for major rotating assembly overhaul/replacement, with main casings designed for 100,000+ hours with proper maintenance.
Spare parts via MAN Energy Solutions SE or authorised distribution partners. Lead time: 2-6 weeks.
Free of charge — send us your request for MAN Energy Solutions equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, MAN Energy Solutions first.
Tell us what you need for this MAN Energy Solutions TCAxx — a part, a service call, a second opinion. Are you MAN Energy Solutions? Claim this brand page.
Service engineer? Write the day report for this TCAxx in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.