Turbocharger · Turbochargers
The MAN NRxx/S is a high‑speed marine turbocharger featuring DLC‑coated hydrodynamic slide bearings and an integrated oil‑supply system, available in axial (TCA), radial (TCR) and diagonal (TCX) turbine designs for power ranges from 600 kW up to 32 400 kW.
What our service work and the manufacturer documentation say about keeping this model running.
Servicing per the manufacturer's manual and classification society requirements. Annual inspection at class survey. Stock spare parts as specified by the manufacturer.
| Daily/Weekly | Operational parameter checks (pressures, temperatures, noise, vibration, leaks). |
|---|---|
| Every 250-500 hours | Compressor water washing (as required by performance drop). |
| Every 500-1000 hours | Turbine dry/wet washing (as required by performance drop). |
| Annually | Class Survey inspection, general visual inspection, performance verification. |
| Every 8,000-16,000 hours | Bearing inspection and replacement (depending on bearing type and operating conditions). |
| Every 16,000-24,000 hours | Major overhaul (rotor inspection, balancing, bearing/seal replacement, casing cleaning). |
| Axial Bearing Play | Exceeding 0.5 mm (new typically 0.15-0.35 mm). |
|---|---|
| Radial Bearing Play | Exceeding 0.3 mm (new typically 0.08-0.20 mm). |
| Blade Tip Clearance | Evidence of rubbing marks on casing or blades, indicating excessive bearing wear or rotor imbalance. |
| Blade Erosion/Damage | Significant material loss (>10-15% of blade area), deep cracks, or chipping. |
| Oil Contamination | Visible water emulsion, excessive carbon particles, or exceeding manufacturer's specified limits for insolubles/water content. |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
The class surveyor will typically verify maintenance records and logbook entries, perform a thorough visual inspection for external leaks (oil, exhaust gas, air), check for unusual noise or vibration during engine operation, inspect the condition of safety devices (e.g., overspeed trip, pressure relief valves), confirm bearing oil pressure and temperature, and assess the integrity of insulation. If the unit is opened for maintenance, the surveyor will inspect the rotor, bearings, nozzle ring, and casing for wear and damage. Availability of critical spare parts as per class requirements will also be checked.
Estimated lifetime: 16,000-24,000 hours before major overhaul (rotor balancing, bearing/seal replacement). Total component lifetime with proper maintenance can exceed 80,000 hours.
Spare parts via MAN Energy Solutions SE or authorised distribution partners. Lead time: 2-6 weeks.
Free of charge — send us your request for MAN Energy Solutions equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, MAN Energy Solutions first.
Tell us what you need for this MAN Energy Solutions NRxx/S — a part, a service call, a second opinion. Are you MAN Energy Solutions? Claim this brand page.
Service engineer? Write the day report for this NRxx/S in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.