Silnik główny 4-suwowy · Silniki główne (4-suwowe)
The MAN L32/40 is a medium‑speed, four‑stroke turbocharged diesel main engine offering modular cylinder counts (6, 8, 12V, 18V) with up to ~4 500 kW output, known for its high power density and fuel flexibility.
Masz kartę katalogową producenta dla tego modelu? Wyślij ją razem z formularzem zapytania — sprawdzimy ją i podamy źródło.
Co nasza praca serwisowa i dokumentacja producenta mówią o utrzymaniu tego modelu w ruchu.
Servicing per the manufacturer's manual and classification society requirements. Annual inspection at class survey. Stock spare parts as specified by the manufacturer.
| Fuel Injector Overhaul/Replacement | 3,000 - 6,000 operating hours |
|---|---|
| Exhaust Valve Overhaul/Replacement | 6,000 - 12,000 operating hours (depending on fuel type and operating conditions) |
| Piston Overhaul (inspection, ring replacement) | 12,000 - 18,000 operating hours |
| Cylinder Liner Inspection/Measurement | 12,000 - 18,000 operating hours |
| Main & Connecting Rod Bearing Inspection/Renewal | 18,000 - 24,000 operating hours |
| Turbocharger Overhaul | 12,000 - 18,000 operating hours |
| Engine Major Overhaul (full strip-down) | 72,000 - 96,000 operating hours |
| Cylinder Liner Wear (max ovality/taper) | 0.6 - 0.8 mm |
|---|---|
| Piston Ring Groove Wear (max clearance) | 0.15 - 0.2 mm |
| Crankshaft Deflection (max deviation between adjacent webs) | < 0.05 mm |
| Main/Connecting Rod Bearing Clearances (max) | 0.15 - 0.2 mm |
| Exhaust Valve Seat Recession (max) | 1.5 - 2.0 mm from original position |
Zakresy są typowe dla tej klasy konstrukcyjnej. Decydujące są zawsze dokumenty producenta dla danego numeru seryjnego.
Class surveyors typically focus on verifying compliance with statutory and classification rules. This includes reviewing engine logbooks, maintenance records, and oil analysis reports. Key checks involve safety devices (overspeed trip, emergency stop, alarm systems), fuel and lube oil system integrity (no leaks, proper filtration), exhaust gas system condition, cooling water system, crankcase relief valves, and engine foundations. Depending on the survey cycle (annual, intermediate, special), specific components like cylinder heads, pistons, or bearings may be opened for inspection and measurement, as per the Planned Maintenance System (PMS) and manufacturer's recommendations.
Szacowana trwałość: 72,000 - 96,000 hours (before major overhaul, assuming proper maintenance)
Spare parts via MAN Energy Solutions SE or authorised distribution partners. Lead time: 2-6 weeks.
Bezpłatnie — wyślij zapytanie dotyczące sprzętu MAN Energy Solutions. Nasz zespół je sprawdzi i odpowie e-mailem.
Inne modele tego samego typu sprzętu, najpierw MAN Energy Solutions.
Powiedz nam, czego potrzebujesz do tego MAN Energy Solutions L32/40 — części, wizyty serwisowej, drugiej opinii. Czy jesteś MAN Energy Solutions? Przejmij tę stronę marki.
Serwisant? Napisz raport dzienny dla tego L32/40 w OceanSphere Work — zdjęcia, godziny i części, jako PDF dla armatora. Wypróbuj 14 dni za darmo →
Tak. Dane techniczne, dokumenty i uwagi serwisowe tego modelu są dostępne bez konta. Konto dodaje zapisane wyszukiwania i zapytania, niczego nie odbiera.
Tak. Podaj producenta, model i czego potrzebujesz — każde zapytanie czyta człowiek i odpowiada e-mailem.
Wyślij nam tabliczkę lub prawidłową wartość. Sprawdzimy ją w karcie danych producenta lub rejestrze towarzystwa klasyfikacyjnego i zaktualizujemy stronę.