MAXI 150 SL-1 WS
Hyundai HMIS (Hyundai Marine Machinery Co., Ltd.) MAXI 150 SL-1 WS — Marine waste oil and solid waste incineration.
Components & Design
Component data being added…
Technical Data
🤖 Ask about this model
One free question — answered like a marine engineer. No account needed.
Common failures & inspection points
Perform routine visual inspections and tactile checks for wear and tear on primary and secondary burners, combustion chamber interior linings, and flue gas channels
Daily cleaning of incinerator chamber inlet, outlet, and burner parts before morning start-up to ensure unrestricted combustion and air flow
Inspect cooling jacket every six months by opening cover plates; clean with steam or hot water if deposits present; verify proper cooling water circulation
Continuously monitor flue gas exit temperature during operation; ensure minimum 850°C during continuous operation and 700°C during safe standby; record temperature trends for deviations
Pre-operation inspection: run sludge heating overnight without circulation pump; drain free water before startup; verify pump pressure and flow rate meet manufacturer specifications
Type-general inspection and maintenance points for this equipment category — not model-specific.
Suppliers & Spare Parts
Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.
📄 Request sourcing links & documentsCases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.
Start free trial →Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.
Maritime Network →