"> Hyundai HMIS (Hyundai Marine Machinery Co., Ltd.) MAXI 50 SL-1 WS
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
Hyundai HMIS (Hyundai Marine Machinery Co., Ltd.)

MAXI 50 SL-1 WS

Hyundai HMIS (Hyundai Marine Machinery Co., Ltd.) MAXI 50 SL-1 WS — Marine waste oil and solid waste incineration.

Hyundai HMIS (Hyundai Marine Machinery Co., Ltd.) MAXI 50 SL-1 WS

Components & Design

Component data being added…

Technical Data

Solid waste capacity 50 kg/h (IMO spec., 2,400 kcal/kg caloric value)
Liquid waste capacity Approx. 25-30 kg/h (8,600 kcal/kg with 20-30% water content)
Combustion capacity 372 kW (320,000 kcal/h)
Chamber design Three-chamber design with castable lining backed up by fire insulation (up to 1600°C)
Operating temperature 850-950°C continuous, minimum 700°C safe operation
Components Primary burner, secondary burner, blower, sludge pump, automatic control panel

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Combustion chamber, burners, and flue gas treatment system deterioration

Perform routine visual inspections and tactile checks for wear and tear on primary and secondary burners, combustion chamber interior linings, and flue gas channels

Chamber inlet/outlet blockage and burner carbon deposits

Daily cleaning of incinerator chamber inlet, outlet, and burner parts before morning start-up to ensure unrestricted combustion and air flow

Cooling jacket and heat exchanger fouling

Inspect cooling jacket every six months by opening cover plates; clean with steam or hot water if deposits present; verify proper cooling water circulation

Abnormal combustion temperatures (below 850°C or above 950°C)

Continuously monitor flue gas exit temperature during operation; ensure minimum 850°C during continuous operation and 700°C during safe standby; record temperature trends for deviations

Sludge pump and oil circulation system malfunction

Pre-operation inspection: run sludge heating overnight without circulation pump; drain free water before startup; verify pump pressure and flow rate meet manufacturer specifications

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #147647 · ✓ still in production