Nippon Pusnes Co., Ltd. NS160HW — Mooring winch with hydraulic motor.

Inspector Detail

Common issues

  • Hydraulic motor leakage at the shaft seal
  • Brake band or brake disc wear reducing holding torque below rated capacity
  • Wire rope and drum wear from repeated mooring loads
  • Control valve sticking, causing jerky or delayed response
  • Low holding brake pressure/torque due to setting drift or worn linings
  • Gearbox oil contamination from water ingress through worn seals

Inspection checklist

  • Brake holding test at rated load
  • Hydraulic pressure check against the manufacturer's setting
  • Wire spooling and drum condition check
  • Gearbox oil sampling for water/contamination
  • Foundation bolt torque check
  • Emergency release/hand-release function test
  • Check hydraulic hoses and fittings for chafing or leakage

Service intervals

Gearbox oil change typically 2,000-4,000 running hours or annually, whichever comes first - confirm against the maker's manual
Brake lining inspection annually, or per company PMS
Grease points weekly to monthly depending on usage, per PMS
Hydraulic filter change per manufacturer's schedule, commonly annually
Brake holding capacity test at each renewal survey and after any brake maintenance

Typical wear limits

Brake lining thickness replacement is typically triggered around 50% of new lining thickness for this class of winch brake - confirm the exact discard figure against the maker's manual
Wire rope discard criteria per class/manufacturer guidance - broken wire counts over a given length and diameter reduction of roughly 7-10% from nominal are typical discard triggers, confirm against the applicable class rule and rope certificate

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Hydraulic motor shaft seal kit
  • Brake lining/pads
  • Wire rope (correct diameter and construction for this winch)
  • Control valve
  • Coupling element

Safety

  • Mooring line snap-back zones - crew must stay clear of the bight during heaving/mooring operations
  • Hydraulic accumulator stored energy - depressurize and lock out before maintenance
  • Crush points at the drum, gearbox and brake mechanism
  • Brake failure risk under load if holding capacity has not been recently verified

Class survey

Mooring winches are surveyed with a brake holding capacity test at renewal survey, and wire condition/load test documentation is typically required to be available.

Estimated lifetime: Mooring winches are generally designed for the vessel's service life (commonly 20-25 years) with periodic overhaul of wear parts; gearbox/hydraulic motor overhaul intervals are often quoted in the range of 40,000-80,000 running hours by manufacturers - confirm against the specific maker's recommendation

Components & Design

Component data being added…

Technical Data

Motor HMC125/S3/125/40/FM3/CS/72/PL830
Drive system Hydraulic

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Brake holding capacity degradation

Render test - brake must hold at minimum 60% of Safe Diagonal Minimum Breaking Load (SDMBL). Oil, moisture, rust on lining can reduce capacity up to 75%

Brake lining wear

Visual inspection for wear, damage, contamination. Maximum allowable wear is 40% (residual thickness must be 60% of original). Measure lining thickness with calipers

Cable winding and line integrity

Inspect proper cable winding on drum - improper winding reduces braking force by up to 50%. Check for kinks, fraying, or damaged sections along entire cable length

Hydraulic system pressure and fluid condition

Verify working pressure approximately 250 bar (for Pusnes ring-main systems). Test fluid for contamination, water ingress, viscosity stability. Check all hoses for leaks, cracks, or excessive wear

Mechanical components and gearbox

Inspect enclosed primary gearbox for oil leaks, gear wear, bearing play. Verify oil-bath lubrication system functioning. Check for noise during operation indicating internal damage

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #147221 · ✓ still in production