"> MAN Energy Solutions / Everllence Alpha CP Propeller Mk 5 (VBS 1180 / 1280 / 1380 / 1460 / 1560 Series)
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 5 verified suppliers & service companies for MAN Energy Solutions / Everllence in the Maritime Network Find suppliers →
MAN Energy Solutions / Everllence

Alpha CP Propeller Mk 5 (VBS 1180 / 1280 / 1380 / 1460 / 1560 Series)

MAN Energy Solutions / Everllence Alpha CP Propeller Mk 5 (VBS 1180 / 1280 / 1380 / 1460 / 1560 Series) — large-range variable pitch propeller for large motorships, container and megaships.

MAN Energy Solutions / Everllence Alpha CP Propeller Mk 5 (VBS 1180 / 1280 / 1380 / 1460 / 1560 Series)

Components & Design

Component data being added…

Technical Data

Hub-Durchmesser 1.180mm - 1.560mm Varianten (Große bis sehr große Schiffe)
Leistung pro Propeller 12.000 - 30.000 kW pro Welle
Pitch-Kontroll-Präzision Fully variable blade pitch through integrated servo-hydraulics in the hub
Oil Distribution Unit Kompakte ODF speziell für Getriebewellenmontage
Betriebsmodus Optimal for maneuvering, anchor handling and economy operation

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Cavitation and erosion damage on blade back and hub

Visual and tactile surface inspection every 5 years (removal of min. one blade). Search for pitting patterns, erosion scars, deformation and cracks on pressure side and root area.

Wear and play in pitch control hydraulics (servo system)

10-yearly complete maintenance: oil analysis, pressure test (90 bar), inspection of all hydraulic lines, seals and thrust rod connections. Wear parts measurement with residual service life evaluation.

Blade shape deviations and stroke wear play

3-point geometric measurement of all blade shape, hub-blade root play and pitch control head clearances. Measurements to be verified against tolerance tables and original drawings.

Vibrations and wear-induced imbalance

Shaft measurement and reverse run control. In case of abnormal vibrations: perform blade bow measurement, check imbalance calibration. Inspect bearing play and shaft deflection.

Seal and wear part aging

Every 5 years: oil change and filter cleaning. Replacement of blade sealing rings (elastomer). 10-year inspection: removal of all blades for undersurface inspection and complete seal kit renewal.

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #146791 · ✓ still in production