"> Azcue MO
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 11 verified suppliers & service companies for Azcue in the Maritime Network Find suppliers →
Azcue

MO

Azcue MO — Marine self-priming close-coupled multistage side channel pump for high-pressure, low-flow vapor extraction.

9 m³/h
Capacity

Inspector Detail

Common issues

  • Mechanical seal wear from dry-running or entrained gas/vapour service
  • Impeller/side-channel clearance wear reducing head and flow performance over time
  • Cavitation from insufficient NPSH available on high-suction-lift vapour extraction duty
  • Bearing wear from misalignment or coupling imbalance
  • Casing erosion from entrained solids or scale in the pumped medium

Inspection checklist

  • Check achieved head/flow against the curve at the operating point
  • Inspect the mechanical seal for leakage during running
  • Check bearing temperature and vibration during running
  • Inspect coupling alignment and condition
  • Check NPSH available versus required for the duty, especially at high suction lift
  • Inspect casing and impeller for erosion/wear at scheduled overhaul

Service intervals

Mechanical seal inspection annually or at first sign of leakage
Performance check (head/flow) annually
Bearing lubrication/replacement typically every 1-2 years depending on running hours
Coupling/alignment check at overhaul or after any disturbance
Internal clearance check (impeller/casing) condition-based, at major overhaul

Critical spares

  • Mechanical seal kit
  • Impeller/side-channel wear rings
  • Shaft bearings
  • Coupling element
  • Casing gasket/O-ring set

Safety

  • Confirm the pumped medium's flammability classification before hot work or seal maintenance nearby if this pump serves a vapour extraction/recovery duty
  • Elevated discharge pressure up to the pump's rated max head means a seal or casing failure can release pressurised, potentially flammable liquid or vapour
  • Verify dry-running protection is functional given the pump's low-flow/vapour duty

Class survey

Where this pump serves a cargo vapour recovery or similar cargo-related duty, it falls under the vessel's cargo system survey requirements; function and performance testing, along with any associated gas detection interlocks, should be verified and documented at survey.

Components & Design

Component data being added…

Technical Data

Max Flow Rate 9 m³/h
Max Head 225 m
Max Temperature 90°C
Max Viscosity 200 cP
Port Sizes DN25 to DN40
Gas Content Tolerance Up to 50% entrained air
Design Multistage side channel (liquid ring)
Materials Cast Iron (GG25), Bronze, Stainless Steel (AISI 316/431)
max head m 225
max temp c 90
max viscosity cp 200
solids mm 0
size DN25 to DN40
source manufacturer datasheet

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Mechanical Seal Leakage

Inspect mechanical seal faces for wear patterns and verify cooling/barrier fluid levels (where applicable). Check for weeping at the seal chamber under operating pressure. Listen for seal-related noise (grinding, squealing) indicating imminent failure.

Bearing Degradation and Lubrication

Monitor bearing temperature trends using infrared thermography. Check grease consistency and color (oxidation indicates overheating). Verify bearing preload and axial movement. Listen for abnormal noise (grinding, rumbling) indicating cage wear or spalling.

Impeller Wear Ring Clearance Increase

Measure clearance between impeller and casing wear rings using feeler gauges. Check for visible scoring or erosion patterns on impeller and casing surfaces. Monitor discharge pressure decline and capacity loss indicating internal bypass.

Self-Priming System Failure (Air Binding)

For VP (vacuum priming): verify ejector vacuum generation (typically 0.7-0.8 bar). For EP (electric priming): test motor operation and check priming pump discharge. Monitor initial prime time; exceeding 30-minute dry-run specification indicates air leak or priming pump degradation.

Cavitation Damage and Suction Strainer Blockage

Check suction line pressure (NPSH available vs. required). Clean/inspect suction strainers for marine growth, scale, or debris accumulation. Listen for cavitation noise ('marbles in pump'). Inspect impeller for pitting or erosion patterns typical of cavitation damage.

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #146209 · ✓ still in production