OceanSphere
Engines
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 11 verified suppliers & service companies for Azcue in the Maritime Network Find suppliers →
Azcue

BR-RR

Azcue BR-RR — Marine self-priming long-coupled reversible multistage side channel pump for bidirectional tank operations.

Components & Design

Component data being added…

Technical Data

Max Flow Rate 45 m³/h
Max Head 225 m
Max Temperature 130°C
Max Viscosity 200 cP
Port Sizes DN25 to DN65
Gas Content Tolerance Up to 50% entrained air
Key Feature Reversible operation (bidirectional)
Model Variants 19 configurations across 5 size categories

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Mechanical Seal Leakage

Inspect mechanical seal faces for wear patterns and verify cooling/barrier fluid levels (where applicable). Check for weeping at the seal chamber under operating pressure. Listen for seal-related noise (grinding, squealing) indicating imminent failure.

Bearing Degradation and Lubrication

Monitor bearing temperature trends using infrared thermography. Check grease consistency and color (oxidation indicates overheating). Verify bearing preload and axial movement. Listen for abnormal noise (grinding, rumbling) indicating cage wear or spalling.

Impeller Wear Ring Clearance Increase

Measure clearance between impeller and casing wear rings using feeler gauges. Check for visible scoring or erosion patterns on impeller and casing surfaces. Monitor discharge pressure decline and capacity loss indicating internal bypass.

Self-Priming System Failure (Air Binding)

For VP (vacuum priming): verify ejector vacuum generation (typically 0.7-0.8 bar). For EP (electric priming): test motor operation and check priming pump discharge. Monitor initial prime time; exceeding 30-minute dry-run specification indicates air leak or priming pump degradation.

Cavitation Damage and Suction Strainer Blockage

Check suction line pressure (NPSH available vs. required). Clean/inspect suction strainers for marine growth, scale, or debris accumulation. Listen for cavitation noise ('marbles in pump'). Inspect impeller for pitting or erosion patterns typical of cavitation damage.

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #146211 · ✓ still in production

Wer liefert dieses Teil? 32 Betriebe im Verzeichnis · 7 aus Herstellerlisten

Bombas Azcue S.A.
Zumaia (Basque Country), Spain
✓ autorisiert
Global Services (Europe) Ltd
NoneUnited Kingdom
✓ autorisiert
Azcue Pumps
Spijkenisse, Netherlands
Azcue Pumps
Spain
Azcue Pumps - Bombas Azcue S. A.
Zumaia Gipuzkoa, Spain
Azcue Pumps USA Inc
United States
Azcue Pumps USA Inc
Houston, United States
Azcue Pumps USA Inc
United States
Castle Pumps Ltd
Wishaw, United Kingdom
Dallaserra Ridderkerk Spares BV
NoneNetherlands
Fluid Global Solutions S.r.l.
Arcola, Italy
Grossistgruppen I Gteborg Ab
Västra Frölunda, Sweden
Weitere aus Hersteller- und Marktplatzverzeichnissen:
Global Services (Europe) Ltd · United KingdomDallaserra Ridderkerk Spares BV · NetherlandsGulfhead Limited · United KingdomKMS Germany - Marine Spare Parts Provider · GermanyNAVSUPPLY Ship Chandler 4 All Needs · BrazilTeknotherm Marine AS · NorwayThames Diesel Injection Parts Ltd · United Kingdom
Alle Betriebe für Azcue ansehen →