"> DESMI Modular S S32-25-110N
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 10 verified suppliers & service companies for DESMI in the Maritime Network Find suppliers →
DESMI

Modular S S32-25-110N

DESMI Modular S S32-25-110N — Bilge pump, self-priming, super bilge.

Inspector Detail

Common issues

  • Mechanical seal leakage from dry-running or debris passing through the pump
  • Loss of prime after standstill, often due to a worn foot valve or air trapped in the casing
  • Impeller and wear-ring erosion from grit, rust scale and rag/debris in bilge water
  • Bearing wear or overheating from misalignment or blocked cooling flow
  • Strainer/suction line clogging causing cavitation and reduced flow
  • Coupling misalignment leading to vibration and premature seal failure
  • Motor overheating or tripping from prolonged dry running

Inspection checklist

  • Check mechanical seal area for weeping or staining
  • Verify self-priming time against the maker's baseline figure
  • Inspect suction strainer and clear of debris
  • Check coupling/shaft alignment
  • Listen and check for cavitation noise or vibration at running speed
  • Check bearing housing temperature and audible condition
  • Inspect discharge non-return valve for correct seating
  • Check foundation bolts and pipework supports for looseness
  • Megger-test motor insulation resistance
  • Confirm local/remote start and bilge alarm interlocks operate correctly

Service intervals

Mechanical seal inspection annually, or sooner if leakage is noted
Suction strainer cleaning monthly, more often if bilges are dirty or oily
Bearing condition check annually as part of running gear survey
Coupling alignment check annually or after any pump/motor removal
Insulation resistance test annually
Impeller/wear-ring clearance check at overhaul, typically every 3-5 years depending on running hours

Typical wear limits

Impeller-to-casing running clearance typically a few tenths of a millimetre for this pump size class - confirm against DESMI's own manual before renewing wear parts
Shaft runout at seal area small fractions of a millimetre are normal; excessive runout drives seal leakage - check against maker tolerance

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Mechanical seal kit
  • Impeller
  • Wear ring / casing ring set
  • Shaft sleeve
  • Gasket and O-ring set
  • Bearing set
  • Coupling element (flexible insert)

Safety

  • Bilge water frequently carries oil residue - slip and fire hazard around the pump seat
  • Rotating shaft and coupling must have guards fitted before running
  • Electrical hazard at the motor terminal box during maintenance - isolate and lock out first
  • Pinch points at the coupling during alignment work

Class survey

Bilge pumps are part of the vessel's bilge and ballast pumping arrangement reviewed under SOLAS/class rules; surveyors typically check pump capacity/duty during periodic bilge system tests and confirm the pump can be run independently of the main engine per the approved bilge pumping arrangement.

Estimated lifetime: Casing and shaft typically last 15-25 years with normal bilge service; seals, wear rings and bearings are consumables replaced on their own separate cycle.

Components & Design

Component data being added…

Technical Data

Type Self-priming horizontal centrifugal pump
Discharge DN 32 mm
Suction DN 25 mm
Impeller Diameter 110 mm
Flow Rate 1-30 m³/h at 50 Hz

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Impeller wear and cavitation damage

Visual inspection of impeller blade surfaces for pitting, erosion, material loss, or uneven wear patterns; listen for cavitation noise during operation; monitor flow rate reduction

Mechanical shaft seal degradation and leakage

Check for liquid dripping at seal housing, visual inspection of seal faces for scoring/wear, verify seal pressure and condition; replace if leakage exceeds acceptable limits

Bearing wear and lubrication condition

Monitor bearing temperature (should not exceed 80°C), listen for grinding noise or vibration, check lubrication levels in larger bearing types with lubrication points

Suction line blockage and air ingestion

Verify suction strainers are clean and not restricted, check NPSH margin at operating point, monitor for cavitation symptoms or reduced prime capability

Self-priming ability loss and foot valve malfunction

Test priming capacity and time to full prime, inspect check valve operation and seal integrity, verify diffuser passages are not blocked (for SA and Modular S series)

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #145245 · ✓ still in production