Turbocharger · Turbochargers
The MET‑WB 48WB is a medium‑speed, four‑stroke turbocharger from Mitsubishi MET designed to boost up to 8 MW (≈8000 kW) of engine power, offering high turbine efficiency in a compact frame.
Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.
| Daily/Weekly | Visual checks, performance monitoring (RPM, temperatures, pressures, vibration). |
|---|---|
| 500-1000 hours | Water washing (if applicable and recommended by manufacturer). |
| 4,000-8,000 hours | Inspection of bearings, seals, nozzle ring, and compressor wheel. Cleaning of gas side components. |
| 8,000-16,000 hours | Replacement of bearings and seals. Detailed inspection of rotor, casings, and diffuser. |
| 16,000-24,000 hours | Major overhaul, including rotor balancing, replacement of all wear parts, detailed NDT of critical components. |
| Rotor Axial Play | Max. 0.15 - 0.25 mm (New typically 0.10-0.15 mm). |
|---|---|
| Rotor Radial Play | Max. 0.40 - 0.60 mm (New typically 0.30-0.40 mm). |
| Compressor Wheel Tip Clearance | Specific to model, but typically 0.5 - 1.0 mm. Check for increase beyond limits due to bearing wear or casing deformation. |
| Bearing Clearances | Manufacturer specific, but typically 0.05-0.10 mm for journal bearings. Replace if clearances exceed specified limits. |
| Nozzle Ring Gap | Max increase of 10-15% from new specification due to erosion/burning. |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
Class surveyors typically focus on: 1. Verification of scheduled maintenance, overhauls, and repairs through logbooks and records (e.g., bearing replacements, cleaning, balancing). 2. Review of operational parameters (RPM, boost pressure, temperatures, vibration) to ensure stable and efficient operation. 3. External inspection for oil/gas leakage, cracks in casings (especially exhaust gas side), security of mounting bolts, and insulation integrity. 4. Confirmation of overspeed trip functionality (if fitted and testable) and integrity of protective screens/guards. 5. Review of recent vibration analysis data or on-site check for excessive vibration. 6. Availability of manufacturer's manuals, service bulletins, and wear limit specifications onboard.
Estimated lifetime: 16,000 - 24,000 running hours for major overhaul, depending on operating conditions and maintenance history. Total design life of major components (casings, rotor shaft) can exceed 100,000 hours with proper maintenance and component replacement.
Free of charge — send us your request for Mitsubishi MET equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, Mitsubishi MET first.
Tell us what you need for this Mitsubishi MET WB 48WB — a part, a service call, a second opinion. Are you Mitsubishi MET? Claim this brand page.
Service engineer? Write the day report for this WB 48WB in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.