Turbocharger · Turbochargers
The ABB TPL‑C 73‑C is a high‑capacity turbocharger built for two‑stroke common‑rail main engines, delivering up to 55 MW of boost power and featuring advanced turbine geometry for optimal efficiency.
Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.
| Compressor water wash | Daily to Weekly (depending on engine load and air quality) |
|---|---|
| Turbine dry wash | Every 250-500 running hours |
| Turbine wet wash | Every 1000-2000 running hours |
| Bearing inspection/replacement | 8,000 - 16,000 running hours (or 1-2 years) |
| Minor overhaul (rotor inspection, cleaning, bearing/seal replacement) | 16,000 - 24,000 running hours (or 2-3 years) |
| Major overhaul (full disassembly, component inspection, NDT, replacement as needed) | 24,000 - 36,000 running hours (or 3-5 years) |
| Journal Bearing Radial Clearance | Increase of 0.15 - 0.25 mm beyond new specification (e.g., new 0.25-0.35mm, limit 0.40-0.60mm) |
|---|---|
| Thrust Bearing Axial Clearance | Increase of 0.05 - 0.10 mm beyond new specification (e.g., new 0.10-0.20mm, limit 0.15-0.30mm) |
| Rotor Run-out (at specific points) | Max 0.03 - 0.05 mm TIR (Total Indicator Reading) |
| Compressor/Turbine Blade Tip Clearance | Increase of 0.1 - 0.3 mm from new specification, or visual evidence of rubbing/contact. |
| Nozzle Ring Opening/Erosion | Increase in gas passage area by >10-15% from new, or significant cracking/deformation. |
| Shaft Journal Diameter | Ovality or taper exceeding 0.02 mm, or significant surface scoring/pitting. |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
Class surveyors will typically review the turbocharger's maintenance records, including service reports, overhaul certificates, and spare parts logs. They will check for external integrity, absence of leaks (oil, gas), and secure mounting. Performance parameters like boost pressure, exhaust gas temperatures, and bearing temperatures (if monitored) will be reviewed against operational norms. The functionality of the overspeed trip device and associated alarms is a critical check. Depending on the survey scope (e.g., Special Survey), internal inspection of bearings, rotor, and casings may be required, necessitating opening the unit. Compliance with manufacturer's service bulletins and any outstanding defects will also be verified.
Estimated lifetime: 24,000 - 36,000 running hours before major overhaul (for core components, with proper maintenance, the unit can last significantly longer)
Free of charge — send us your request for ABB Turbocharging / Accelleron equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, ABB Turbocharging / Accelleron first.
Tell us what you need for this ABB Turbocharging / Accelleron TPL-C 73-C — a part, a service call, a second opinion. Are you ABB Turbocharging / Accelleron? Claim this brand page.
Service engineer? Write the day report for this TPL-C 73-C in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.