The ABB TPL‑A 73 is a high‑capacity turbocharger designed for two‑stroke marine diesel main engines, delivering up to 50 MW of boost pressure to improve fuel efficiency and emissions.
Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.
| Routine operational checks (temps, pressures, vibration) | Daily/Weekly |
|---|---|
| Compressor washing | As required, typically 24-72 running hours |
| Turbine washing | As required, typically 100-200 running hours |
| Inspection of compressor/turbine side (via inspection covers) | 1,000 - 2,000 running hours |
| Bearing inspection and/or renewal | 12,000 - 16,000 running hours |
| Major overhaul (rotor out, full inspection/renewal of wear parts) | 24,000 - 32,000 running hours |
| Rotor shaft inspection/renewal | 48,000 running hours |
| Journal bearing radial clearance | 0.15 - 0.30 mm (check specific manual for exact limits) |
|---|---|
| Thrust bearing axial clearance | 0.10 - 0.20 mm (check specific manual for exact limits) |
| Turbine blade erosion/material loss | Max 10-15% of original blade thickness or specific depth/area as per manual |
| Nozzle ring passage area deviation | Max 5-10% deviation from new condition due to erosion/fouling |
| Compressor wheel blade tip clearance | Specific to model, typically 0.5 - 1.5 mm (check manual for max allowable) |
| Rotor shaft run-out (at specific points) | Max 0.02 - 0.05 mm |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
Class surveyors typically verify the turbocharger's maintenance records (running hours, bearing renewals, cleaning logs). They will visually inspect the external casing for leaks (oil, exhaust gas), cracks, and proper securing. Operational parameters (temperatures, pressures, vibration) are checked against acceptable limits. If the turbocharger has been opened for maintenance, the surveyor will inspect internal components (bearings, rotor, nozzle ring, blades) for wear, damage, and cleanliness. The condition of exhaust gas expansion bellows and the functionality of safety devices (e.g., overspeed trip, if testable) are also key inspection points. Verification of critical spare parts onboard may also be requested.
Estimated lifetime: 24,000 - 32,000 running hours (before major overhaul requiring rotor removal and extensive component inspection/renewal)
Free of charge — send us your request for ABB Turbocharging / Accelleron equipment. Our team checks it and replies by e-mail.
Other models of the same equipment type, ABB Turbocharging / Accelleron first.
Tell us what you need for this ABB Turbocharging / Accelleron TPL-A 73 — a part, a service call, a second opinion. Are you ABB Turbocharging / Accelleron? Claim this brand page.
Service engineer? Write the day report for this TPL-A 73 in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →
Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.
Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.
Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.