4-Takt-Hauptmotor · Hauptmotoren (4-Takt)
The Perkins 6LM300C is a medium‑speed, 6‑cylinder inline marine diesel engine delivering 360 kW at 2400 rpm, featuring common‑rail fuel injection and IMO Tier III emissions compliance.
Haben Sie das Herstellerdatenblatt zu diesem Modell? Schicken Sie es mit dem Anfrageformular — wir prüfen es und nennen die Quelle.
| Engine oil and oil filter replacement | Every 250-500 hours / Annually (whichever comes first) |
|---|---|
| Fuel filter elements replacement (primary and secondary) | Every 250-500 hours / Annually |
| Air filter element replacement | Every 1000 hours / Annually |
| Inspect turbocharger | Every 1000 hours / Annually |
| Inspect drive belts | Every 1000 hours / Annually |
| Check and adjust valve clearances | Every 500-1000 hours (refer to specific manual) |
| Coolant replacement | Every 2000 hours / 2 years |
| Inspect/clean heat exchangers | Every 2000 hours / 2 years |
| Inspect raw water pump impeller | Every 2000 hours / 2 years |
| Test fuel injectors | Every 2000-4000 hours |
| Major service (HPFP inspection, turbocharger overhaul, vibration damper inspection) | Every 4000-6000 hours / 4-6 years |
| Cylinder Liner Wear (Taper/Ovality) | Max 0.10 - 0.15 mm |
|---|---|
| Crankshaft Main/Big End Bearing Clearance | Max 0.10 - 0.15 mm |
| Piston Ring End Gap (Top Compression Ring) | Max 1.0 - 1.5 mm |
| Valve Stem to Guide Clearance | Max 0.15 - 0.20 mm |
| Turbocharger Rotor Axial Play | Max 0.15 - 0.20 mm |
| Turbocharger Rotor Radial Play | Max 0.30 - 0.40 mm |
Die Bereiche sind für diese Bauklasse typisch. Maßgeblich sind stets die Herstellerunterlagen zur jeweiligen Seriennummer.
Class surveyors typically check for: Functionality of all safety devices (overspeed trip, low oil pressure/high temperature shutdowns, emergency stops). Integrity and proper securing of fuel lines (especially high-pressure common rail lines, checking for double-walled where required), filters, and tanks for leaks and fire safety. Exhaust system integrity, insulation, and securing. Engine room ventilation system operation and fire damper functionality. Review of engine logbook, maintenance records, fuel oil bunkering records, and any defect reports or class recommendations. Overall cleanliness, absence of excessive leaks, proper securing of components, and evidence of routine maintenance. Verification of Tier III emissions compliance through documentation and visual inspection (e.g., no excessive smoke). Inspection of engine mounts and foundations for structural integrity, corrosion, and proper securing.
Geschätzte Lebensdauer: 15,000 - 25,000 hours (before major overhaul, with proper maintenance)
Kostenlos — senden Sie uns Ihre Anfrage zu Perkins Marine-Ausrüstung. Unser Team prüft sie und antwortet per E-Mail.
Weitere Modelle desselben Ausrüstungstyps, zuerst Perkins Marine.
Sagen Sie uns, was Sie für diesen Perkins Marine 6LM300C benötigen — ein Ersatzteil, einen Serviceeinsatz, eine zweite Meinung. Sind Sie Perkins Marine? Diese Herstellerseite beanspruchen.
Servicetechniker? Schreiben Sie den Tagesbericht für diesen 6LM300C in OceanSphere Work — Fotos, Stunden und Teile, als PDF für den Reeder. 14 Tage kostenlos testen →
Ja. Technische Daten, Dokumente und Servicehinweise zu diesem Modell sind ohne Konto lesbar. Ein Konto bringt gespeicherte Suchen und Anfragen dazu, es nimmt nichts weg.
Ja. Nennen Sie uns Hersteller, Modell und Bedarf — ein Mensch liest jede Anfrage und antwortet per E-Mail.
Schicken Sie uns das Typenschild oder den richtigen Wert. Wir prüfen ihn gegen das Herstellerdatenblatt oder den Klassifikationsdatensatz und aktualisieren die Seite.