"> Karmøy Winch Karmøy Winch TW-130t Electric-C
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 1 verified suppliers & service companies for Karmøy Winch in the Maritime Network Find suppliers →
Karmøy Winch

Karmøy Winch TW-130t Electric-C

Karmøy Winch Karmøy Winch TW-130t Electric-C is identified in the source list as a towing winch. It is installed on a reinforced working deck, typically on a tug or towing vessel, with a clear towline lead to the towing point or fairlead. Its purpose is to control, guide, secure or release towing loads according to the listed equipment type. The source record provides no additional model-specific operating figure beyond the listed designation and category. Towing machinery is integrated with foundations, brakes or locking elements, drives, controls and line-contact components designed for dynamic tow loads. The exact model designation and any load information in the source distinguish capacity and arrangement from neighboring towing equipment; refer to the manufacturer documentation for the exact figure.

Components & Design

Component data being added…

Technical Data

line pull t 130
drive Electric

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Brake or clutch deterioration caused by repeated high-energy loading or poor adjustment, resulting in slipping, overheating or inability to control line tension
Hydraulic or electric drive failure caused by leakage, motor faults or control problems, resulting in slow or unavailable operation
Drum, pin, fairlead or sheave wear caused by towline loading and corrosion, resulting in rope damage, vibration or poor line guidance
Load-monitoring or control-system fault caused by sensor, wiring or calibration problems, resulting in missing or implausible tension indication
Structural or securing damage caused by shock loads and fatigue, resulting in cracking, deformation or abnormal movement at foundations

Service & Maintenance

Inspect brakes, drums, pins, fairleads, sheaves, drive components, foundations and guards before towing operations. Check towline contact surfaces and remove burrs or damage that could harm the line. Function-test local and remote controls, emergency release and load-monitoring features where fitted using the approved procedure. Inspect hydraulic hoses and valves or electrical equipment according to drive type. Examine foundations and high-load welds for corrosion or cracking and keep personnel clear of loaded-line danger zones. Refer to the manufacturer documentation for the exact figure for brake settings, load tests, inspection intervals and wear limits.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Keep brake service parts, hydraulic seals or hose consumables where applicable, control switches, sensors, bearings and manufacturer-recommended line-contact wear parts. Critical release components must match the approved towing system. Heavy drums, gears and structural parts are normally strategic spares.
Equipment Model #138992 · ✓ still in production