"> d-i davit international-hische GmbH D-CRc.11/3,5 02.09.01
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 2 verified suppliers & service companies for d-i davit international-hische GmbH in the Maritime Network Find suppliers →
d-i davit international-hische GmbH

D-CRc.11/3,5 02.09.01

The D‑CRc.11/3,5 davit is an IMO‑approved lifeboat/raft launch system featuring configurable hoist capacity and hybrid drive options (electric, hydraulic or manual) with a fast‑rescue speed of up to 48 m/min and optional docking head to suppress pendulum motion.

d-i davit international-hische GmbH D-CRc.11/3,5
02.09.01
Persons capacity per SOLAS certification
Capacity
Crew Evacuation / Safety
Medium

Inspector Detail

Common issues

  • Wire fall wear or corrosion, particularly at drum and sheave contact points
  • Docking head misalignment leaving pendulum motion not fully suppressed
  • Electric drive motor or hydraulic pump faults limiting available drive modes
  • Brake system drift under load
  • Limit switch or overrun protection failures
  • Manual back-up drive (handwheel/crank) seized from lack of use

Inspection checklist

  • Visual inspection of wire falls, drum, and sheaves
  • Test all available drive modes - electric, hydraulic, and manual - in turn
  • Check docking head function and alignment against the hull
  • Test brake holding and controlled lowering speed
  • Test on-load release gear per the maker's procedure
  • Check limit switches and overspeed/overrun protection
  • Verify emergency stop and local/remote control stations

Service intervals

Weekly operational test per SOLAS, davit and boat operated through range where practicable
Monthly inspection visual and functional per the LSA Code
Annual thorough examination per SOLAS III/20 and the LSA Code by a competent person
On-load release gear overhaul and load test every 5 years, per SOLAS III/20.11
Manual back-up drive exercise at each monthly test, to prevent seizure

Typical wear limits

Wire fall reject per the LSA Code wire rope rejection criteria - condition-based, not a fixed number
Brake lining inspect for glazing and thickness per the maker's manual, no generic figure applies across davit sizes

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Wire fall set
  • Brake linings/pads
  • Limit switch assemblies
  • On-load release gear components
  • Hydraulic pump or electric drive motor seal/brush set, as applicable

Safety

  • On-load release gear malfunction risk as with all davit systems - strict test procedure adherence required
  • Suspended load hazard during any test or maintenance
  • Multiple drive modes increase the risk of an un-isolated back-up drive engaging unexpectedly - confirm all drives isolated before working on the mechanism
  • Docking head pinch points

Class survey

As an IMO/SOLAS-approved launching appliance, subject to the same SOLAS III/20 and LSA Code inspection, annual thorough examination, and 5-yearly overhaul/load test regime as other lifeboat/raft davits; class specifically checks on-load release gear overhaul records.

Estimated lifetime: Davit structure is designed for the ship's service life with periodic overhaul; wire falls and on-load release gear are renewed on the condition/interval basis above rather than by running hours, given the intermittent duty cycle.

Components & Design

Component data being added…

Technical Data

imo approved True

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

On-load release gear functionality and wear

Annually: operational test of on-load release gear by positioning the boat partially in water for load support by fall, actuation of release gear, reset and inspection for damage. Every 5 years: overhaul of release system with 110% proof-load test. Inspect release gear before and after operational test; verify hook securing and reset.

Wire rope condition (wires/falls) – corrosion, wear, breakage

Monthly: visual inspection for fraying, kinks, corrosion, broken strands. Annually: wire rope and sheaves for scratches, dents, corrosion, missing lubrication. Every 5 years: wire rope replacement per SOLAS Chapter III required. Lubrication of wires, sheaves and moving parts to be checked.

Brake system - inspection function and wear parts

Annually: brake test by suspension of rated load and verification that brake holds without slippage. For centrifugal brakes: sinking speed against SOLAS formula (max. 1.3 m/s) to be checked. Brake pads to be inspected and replaced when worn. Every 5 years: brake system to be opened and condition thoroughly checked.

Sheaves - wear, abrasion, corrosion, wear rings

Annually: sheaves for wear grooves, wear ring wear, corrosion, incorrect alignment, loose bolts to be checked. A worn or corroded sheave damages new wires and leads to premature wire rope failure. Wear ring thickness to be measured and replaced if necessary. Lubrication to be checked.

Overall structure - corrosion, wear, deformation and clearance

Annually: davit structure for corrosion (especially welds), wear, deformation, excessive clearance, cracks to be checked. All bolt locking devices to be verified. Hydraulic cylinders for leakage to be checked. Every 5 years: selective disassembly with NDT (roughness inspection, crack inspection) to be performed. Foundations to be inspected.

Proof-load test at 110% of rated load

Annually: dynamic winch brake test at 110% of Safe Working Load to be performed (simulated by water bag equipment or certified load cells). Every 5 years: comprehensive proof-load test of entire davit, winch, wire rope and hook system at 110% SWL to be performed. System must hold load, show no deformation or damage.

Type-general inspection and maintenance points for this equipment category — not model-specific.

Service & Maintenance

Engine test weekly (min. 5 min). Release hook maintenance annually by approved service (SOLAS MSC.402(96)). GRP hull inspection at docking. 5-year basic survey.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Spare parts via d-i davit international GmbH or authorized distributors. Lead time: 2-6 weeks.
Equipment Model #12371 · ✓ still in production