D-RC.21/3,65/QR 04.08.08
The D‑RC.21/3,65/QR is a versatile davit system for launching lifeboats, fast rescue boats or MOB craft, featuring selectable electric, hydraulic or manual drive and an optional docking head to minimise pendulum swing during hoist.
Components & Design
Component data being added…
Technical Data
🤖 Ask about this model
One free question — answered like a marine engineer. No account needed.
Common failures & inspection points
Annually: operational test of on-load release gear by positioning the boat partially in water for load support by fall, actuation of release gear, reset and inspection for damage. Every 5 years: overhaul of release system with 110% proof-load test. Inspect release gear before and after operational test; verify hook securing and reset.
Monthly: visual inspection for fraying, kinks, corrosion, broken strands. Annually: wire rope and sheaves for scratches, dents, corrosion, missing lubrication. Every 5 years: wire rope replacement per SOLAS Chapter III required. Lubrication of wires, sheaves and moving parts to be checked.
Annually: brake test by suspension of rated load and verification that brake holds without slippage. For centrifugal brakes: sinking speed against SOLAS formula (max. 1.3 m/s) to be checked. Brake pads to be inspected and replaced when worn. Every 5 years: brake system to be opened and condition thoroughly checked.
Annually: sheaves for wear grooves, wear ring wear, corrosion, incorrect alignment, loose bolts to be checked. A worn or corroded sheave damages new wires and leads to premature wire rope failure. Wear ring thickness to be measured and replaced if necessary. Lubrication to be checked.
Annually: davit structure for corrosion (especially welds), wear, deformation, excessive clearance, cracks to be checked. All bolt locking devices to be verified. Hydraulic cylinders for leakage to be checked. Every 5 years: selective disassembly with NDT (roughness inspection, crack inspection) to be performed. Foundations to be inspected.
Annually: dynamic winch brake test at 110% of Safe Working Load to be performed (simulated by water bag equipment or certified load cells). Every 5 years: comprehensive proof-load test of entire davit, winch, wire rope and hook system at 110% SWL to be performed. System must hold load, show no deformation or damage.
Type-general inspection and maintenance points for this equipment category — not model-specific.
Service & Maintenance
Engine test weekly (min. 5 min). Release hook maintenance annually by approved service (SOLAS MSC.402(96)). GRP hull inspection at docking. 5-year basic survey.
Suppliers & Spare Parts
Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.
📄 Request sourcing links & documentsCases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.
Start free trial →Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.
Maritime Network →