OceanSphereENGINES

M6-MFM

Central Cooler (Plate Type) · Heat Exchangers

Class-certified type (DNV register) · technical data sheet not yet verified​‌​​​​​⁠⁠‍​‌⁠‌‍‍‍⁠‌‌

Alfa Laval M6-MFM gasketed plate-and-frame heat exchanger from the M-line (industrial heating, marine HVAC). Plate count 10-200, max flow rate 35 m3/h, design pressure 16 bar, max temperature 110 C. M-line is the workhorse industrial gasketed PHE — widely used for marine LT/HT cooling and engine cooling.

Specifications

Technical data.

Do you have the manufacturer datasheet for this model? Send it with the enquiry form — we check it and name the source.

Heat Exchanger TypeAlfa Laval Gasketed Plate Heat Exchangers (GPHE)
Inspection

Inspector Detail

Common issues

  • Gasket hardening or shrinkage over time leading to inter-plate leakage
  • Fouling/scaling on the seawater side reducing heat transfer efficiency
  • Biofouling (marine growth) in seawater-cooled circuits, especially in warm-water trading
  • Plate corrosion/pitting from chloride attack if plate material or water treatment is inadequate
  • Gasket carrier groove corrosion affecting gasket seating
  • Cross-contamination between circuits from a failed plate/gasket, mixing freshwater and seawater sides
  • Uneven flow distribution from partial blockage causing localised overheating or fouling
  • Tie-bolt corrosion or seizure making plate pack disassembly difficult

Inspection checklist

  • Check for external leakage at the gasket edges/observation ports between plates
  • Monitor the temperature approach (inlet/outlet delta) against the commissioning baseline for signs of fouling
  • Inspect the plate pack tightening dimension against the manufacturer's specification for the fitted plate count
  • Open and inspect plates for scaling, biofouling, pitting, and gasket condition at scheduled intervals
  • Check the seawater side for marine growth and confirm any biocide/anti-fouling dosing is functioning
  • Inspect gasket carrier grooves for corrosion before re-gasketing
  • Verify pressure drop across the exchanger against baseline to detect partial blockage
  • Check the frame, tie bolts, and support feet for corrosion and correct torque
  • Confirm no cross-contamination by checking for oil/coolant traces on the opposite circuit's discharge

Service intervals

External leak / temperature approach checkmonthly, as part of routine engine room rounds
Full plate pack opening and inspectionannually, or per manufacturer's recommendation based on water quality and fouling rate
Gasket replacementat each full opening, or per Alfa Laval's interval - do not reuse compressed gaskets
Tightening dimension/torque checkat each re-assembly after opening

Typical intervals for this design class, not the manufacturer’s figures for your model. The manufacturer’s manual is binding.

Typical wear limits

Plate pack tightening dimensionper Alfa Laval's specification for this plate count and gasket thickness - do not exceed the manufacturer's minimum/maximum stack dimension
Plate thickness loss from corrosion/erosionmonitor against Alfa Laval's minimum plate thickness for this model - confirm the exact figure in the manufacturer's manual before returning a pitted plate to service
Heat transfer degradation (temperature approach increase)a sustained rise of several degrees above the commissioning baseline typically indicates fouling requiring cleaning

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Full gasket set for the plate pack (correct elastomer for the service, e.g. NBR/EPDM/Viton)
  • Individual replacement plates (a small stock is normal since occasional plate damage/pitting is expected)
  • Tie bolt and washer set
  • Frame plate seals

Safety

  • Pressurised system up to the unit's design pressure (16 bar for this model) - fully depressurise and isolate before opening
  • Hot surfaces where the unit handles high-temperature circuits (rated to 110 C for this model) - allow cooling before opening
  • Heavy plate pack components - use proper lifting/handling technique when opening large plate counts
  • Incorrect re-tightening can cause gasket blow-out under pressure - always tighten to the manufacturer's dimension, not by feel

Class survey

Central coolers are normally covered under Continuous Survey Machinery. Class checks for records of periodic opening/inspection, any plate replacements, and pressure test results after re-assembly, particularly where the unit forms part of the sea water cooling system for classed essential machinery.

Estimated lifetime: Not meaningfully expressed in running hours. Plate heat exchanger frames typically remain in service for the vessel's operating life with periodic re-gasketing and occasional plate replacement; plate and gasket life depends heavily on water quality, chloride content, and biofouling control rather than a fixed hours figure.

Need this part?

Request a quote for this model.

Free of charge — send us your request for Alfa Laval equipment. Our team checks it and replies by e-mail.

For marine equipment hardly any maker or authorised dealer will name a price while the vessel is unknown. With the vessel details, availability and price can be settled faster; without them we may have to ask first, which costs a few days. If you are not allowed to name the vessel, a photo of the rating plate is enough — attach it below or send it as a reply to our confirmation e-mail.

Your contact details are not published. No account required.
Related models

Also in Central Cooler (Plate Type).

Other models of the same equipment type, Alfa Laval first.

By manufacturer Alfa LavalWärtsiläAPVGEASondexAll manufacturersSpare parts by equipmentNew here? Create a free account Can't read the plate? Try the nameplate scanner All Alfa Laval models More like Alfa Laval M6-MFM
More than the data sheet shows

We answer by e-mail, never with an automatic reply.

Tell us what you need for this Alfa Laval M6-MFM — a part, a service call, a second opinion. Are you Alfa Laval? Claim this brand page.

Service engineer? Write the day report for this M6-MFM in OceanSphere Work — photos, hours and parts, as a PDF for the owner. Try it free for 14 days →

Frequently asked

Questions that come up with this equipment.

Is this model's data free?

Yes. Specifications, documents and service notes for this model are readable without an account. An account adds saved searches and requests, nothing is taken away.

Can you find a part for this exact model?

Yes. Tell us the manufacturer, the model and what you need — a person reads every request and replies by e-mail.

The specifications look wrong — what now?

Send us the nameplate or the correct value. We check it against the manufacturer datasheet or class-society record and update the page.