"> Alfa Laval S.p.A. Alfa Laval T8-60P
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 80 verified suppliers & service companies for Alfa Laval S.p.A. in the Maritime Network Find suppliers →
Alfa Laval S.p.A.

Alfa Laval T8-60P

Alfa Laval T8-60P gasketed plate-and-frame heat exchanger from the Industrial Line (industrial heat recovery). Plate count 10-250, max flow rate 34.2 m3/h, design pressure 16 bar, max temperature 110 C. Used in marine engine room duties — central cooling, jacket water, lube oil cooling — and industrial heating.

Alfa Laval S.p.A. Alfa Laval T8-60P

Components & Design

Component data being added…

Technical Data

hx type Alfa Laval Gasketed Plate Heat Exchangers (GPHE)

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Gasket wear and embrittlement

Inspect seals visually for cracks, hardening, swelling and discoloration; verify material compatibility with process fluids; check ClipGrip™ fastening. Aging symptoms and loss of elasticity are replacement indicators.

Clamping dimension and tightness (Tightening Dimension A)

Verify A-dimension per manufacturer specifications with caliper (metallic contact required). Keep bolts clean and lubricated. Avoid over-tightening. Perform regular re-tightening after operating hours. At too low A-dimension, pressure loss and leakage are to be expected.

Fouling and scale formation on plate surfaces

Monitor pressure differential across heat exchanger (increase indicates deposits). Check heat duty versus design value. Optimize CIP intervals after performance audits. Deposits generate higher pump load (energy waste up to 8,000 kWh/year possible).

Plate corrosion and cracks / breakthroughs

After disassembly, inspect plate surfaces for local measurements (pitting), cracks and perforation corrosion. Verify material compatibility with process fluid. Observe fatigue cracks especially at corners and transitions. When perforation occurs, plate is unrecoverable and must be replaced.

Pressure test and tightness inspection

After disassembly and cleaning, perform hydrostatic test per data sheet. Test pressure typically 1.5× operating pressure. Check external and internal leakage at all connections and plate edges. Document findings.

Plate sequence and alignment (5-point alignment)

After opening, verify plate sequence and honeycomb pattern (corrected chevron patterns must alternate). Activate/validate 5-point alignment system for larger units. Offset or misplacement leads to short-circuiting and reduced heat duty.

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #65504 · ✓ still in production