Viking Type 100 DKS S30, 101-person self-righting SOLAS A or SOLAS B inflatable liferaft approved for extended service intervals in accordance with SOLAS regulation III/20.8.3.
Viking Type 100 DKS S30, 101-person self-righting SOLAS A or SOLAS B inflatable liferaft approved for extended service intervals in accordance with SOLAS regulation III/20.8.3.. INFLATABLE LIFERAFT (SOLAS).
Inspector Detail
▸
Common issues
- Painter line chafe or incorrect attachment at the hydrostatic release unit (HRU)
- HRU expiry lapsing unnoticed if not tracked against its own due date, separate from the raft's service date
- Inflation gas cylinder pressure loss found only at the approved service station
- Canopy fabric UV degradation or chafe from prolonged deck stowage exposure
- Container or cradle corrosion, especially at exposed weather-deck stowage positions
- Retro-reflective tape and water-activated light/battery reaching expiry unnoticed
- Boarding ladder or righting strap wear on the self-righting arrangement
- Container/valise seal failure allowing water ingress before deployment
Inspection checklist
- Confirm the annual/periodic service due date and that the service is done at an approved Viking station
- Check the hydrostatic release unit expiry date and correct fitting/orientation
- Inspect the painter line attachment, lashings, and cradle/stowage arrangement
- Check the external condition of the container - no cracking, corrosion, or damaged seals
- Verify weight and date markings on the container match the ship's LSA register
- If claiming the extended service interval under SOLAS III/20.8.3, confirm the vessel holds the specific written approval for that scheme
- Inspect the quick-release/manual release gear at the cradle
- Verify the float-free arrangement and the correct-rated HRU weak link is fitted
- Confirm the launching arc is unobstructed
- Cross-check the raft's stated capacity against the current lifesaving appliance plan and manning
Service intervals
| Annual/periodic service | per SOLAS and flag state requirement, typically annually unless the vessel holds approval for the extended service scheme |
| Extended service interval (if approved) | up to 30 or 36 months under SOLAS III/20.8.3, subject to the approved condition-based scheme and manufacturer authorisation |
| Hydrostatic release unit replacement/service | per the HRU manufacturer's interval, typically every 2 years or per the expiry date marked on the unit |
| Painter line and lashing inspection | at each routine crew LSA inspection, typically monthly |
Typical wear limits
| HRU hydrostatic release depth setting | typically 1.5-4 m per SOLAS requirement - confirm the specific unit's rated release depth on its markings |
| Container/cradle corrosion | any through-wall corrosion or cracking is cause for immediate replacement, not repair |
Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.
Critical spares
- Hydrostatic release unit - like-for-like replacement with the correct weak-link rating
- Painter line and rope-to-raft attachment fittings
- Water-activated or battery light unit
- Cradle/container lashing straps
Safety
- The inflation gas cylinder is pressurised and sealed inside the container - never attempt to open or service it onboard
- Incorrect HRU installation can cause premature release or failure to float free - a serious life-safety risk
- Never stow a liferaft container where the launching arc is obstructed
- The painter line must run clear to avoid entanglement with the vessel during float-free or deployment
- Only trained personnel at an approved service station should open, repack, or service the raft
Class survey
Note: this record is filed under 'Freefall Lifeboat' but the actual product is a SOLAS-approved inflatable liferaft (davit-launched/throw-over type), not a freefall lifeboat - the content above addresses the liferaft. Class/flag state survey checks that the service certificate is current and the HRU expiry has not passed; where the extended service interval under SOLAS III/20.8.3 is claimed, survey checks the vessel holds the specific approval letter for that scheme and that the raft has not exceeded the approved condition-based limits.
Components & Design
Component data being added…
Technical Data
🤖 Ask about this model
One free question — answered like a marine engineer. No account needed.
Suppliers & Spare Parts
Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.
📄 Request sourcing links & documentsCases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.
Start free trial →Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.
Maritime Network →