JM-98L EPOXY PUTTY
JM-98L EPOXY PUTTY by Taicang City Jinmao New Material Technology Co., Ltd.. DNV TA certificate TAM00001AT.
Inspector Detail
▸
Common issues
- Incomplete cure from incorrect mixing ratio or application outside the specified temperature range
- Poor adhesion from inadequate surface preparation (contamination, insufficient roughening)
- Shrinkage or cracking when applied in excessive layer thickness beyond the maker's limit
- Reduced shelf life or premature hardening in the container from improper storage
- Use past the expiry date leading to unreliable cure
Inspection checklist
- Check batch/expiry date and storage condition before use
- Verify surface preparation (cleaning, profile) meets the maker's application instructions
- Confirm mixing ratio and pot life are followed per the datasheet
- Visual/tactile check of cured putty for hardness, adhesion and absence of cracking
- For structural repairs, confirm the application was reviewed/accepted by class where required
Service intervals
| Shelf life / expiry check before use | per the batch expiry date printed on the container - confirm the exact period against the product datasheet |
| Storage condition check | periodic, per the safety data sheet temperature/humidity limits |
| Repair inspection where used as a structural patch | typically at each annual survey |
| Mixing tools and application equipment cleaning | after each use |
Critical spares
- Replacement product from current-dated stock (same type)
- Compatible primer, if specified by the product system
- Dedicated mixing tools
- PPE (gloves, eye protection) per the safety data sheet
- Application tools (spatula/trowel) for the product
Safety
- Uncured epoxy components can cause skin/eye irritation and sensitization - use PPE (gloves, eye protection) per the safety data sheet
- Ensure adequate ventilation during mixing and application
- Store away from ignition sources per the safety data sheet
Class survey
Where epoxy putty repairs are used on structural or pressure-retaining items, class approval (product type approval plus, in many cases, prior notification or acceptance of the specific repair) is typically required; repairs should be documented and the product's DNV Type Approval certificate referenced in survey records.
Components & Design
Component data being added…
Technical Data
🤖 Ask about this model
One free question — answered like a marine engineer. No account needed.
Suppliers & Spare Parts
Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.
📄 Request sourcing links & documentsCases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.
Start free trial →Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.
Maritime Network →DNV type approval
Verified against the DNV Approval Finder — the certificate below is issued by DNV, not by us.
- Certificate
- TAM00001AT
- Approved as
- Pourable Compound for Foundation Chocking · Machinery Components
- Certificate holder
- Taicang City Jinmao New Material Technology Co., Ltd. (China)
- Valid until
- 2028-04-02