"> Kongsberg Maritime AS Avd. Longva Common Control Platform CCP project 141004 (Marine Controller H6045), CCP project 141007 (Marine Controller H6059, Type H1151), CCP project 141009 (Marine Controller H1170)
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 5 verified suppliers & service companies for Kongsberg Maritime AS Avd. Longva in the Maritime Network Find suppliers →
Kongsberg Maritime AS Avd. Longva

Common Control Platform CCP project 141004 (Marine Controller H6045), CCP project 141007 (Marine Controller H6059, Type H1151), CCP project 141009 (Marine Controller H1170)

The Kongsberg Common Control Platform (CCP) marine controllers (H6045, H6059/H1151, H1170) provide integrated monitoring and automated control of Moss membrane cargo tanks on gas carriers, handling pressure, temperature, BOG management, venting and gas detection in a single DNV‑approved system.

Per IGC Code requirements
Capacity
LNG / LPG / Gas Cargo
Medium

Inspector Detail

Common issues

  • Sensor drift or failure on tank level, pressure or temperature transmitters feeding the control system
  • Communication/network faults between the controller and field instrumentation or the integrated automation system
  • Software/firmware faults requiring reboot or reload, especially after a power interruption
  • Gas detection sensor calibration drift affecting alarm reliability
  • Valve actuator feedback discrepancy between commanded and actual position
  • BOG (boil-off gas) management logic faults causing incorrect venting or compressor sequencing
  • Power supply or UPS backup failure affecting control system availability

Inspection checklist

  • Verify all tank level, pressure and temperature readings against independent local instrumentation
  • Check gas detection system calibration certificates and function-test alarm points
  • Confirm valve position feedback matches commanded state for cargo, vent and BOG valves
  • Test alarm and shutdown functions (high level, high pressure, low temperature) per maker procedure
  • Verify UPS/backup power supply function and battery condition
  • Check communication link status between the controller, field devices and the integrated automation system
  • Review the alarm and event history log for recurring or unresolved faults
  • Confirm software/firmware version matches the maker's approved configuration
  • Inspect the control cabinet for condition, cleanliness and secure cable terminations

Service intervals

Gas detection sensor calibration per maker/class requirement, typically every 6-12 months
UPS battery check/replacement per maker manual, commonly every 2-4 years
Software/firmware version review at each planned maintenance or class survey
Sensor/transmitter calibration check against an independent reference annually or per maker schedule
Alarm and shutdown function test annually, per class requirement for cargo containment safety systems

Critical spares

  • Spare pressure, level and temperature transmitters matching the system's approved type
  • Gas detection sensor heads/cartridges
  • Control cabinet fuses, relays and power supply modules
  • UPS batteries
  • Valve actuator position feedback sensors

Safety

  • Reliance on a single control system for cargo containment safety - always confirm independent local instrumentation before manual intervention
  • Cryogenic hazard from the cargo if manual valve operation is required following a control system fault
  • Confined space and gas hazard considerations if fault-finding requires access near cargo tank penetrations
  • Electrical hazard when opening control cabinets - isolate per permit-to-work

Class survey

Cargo containment control systems on gas carriers are surveyed against the IGC Code - function tests of high-level/high-pressure alarms and shutdowns, gas detection calibration records, and confirmation the approved software/firmware configuration is unchanged since the last survey.

Estimated lifetime: Controller units and I/O modules are commonly kept in service 15-20 years with periodic module-level replacement rather than full-life wear-out; obsolescence of electronic components is often the practical limit rather than mechanical wear - confirm against the maker's support/end-of-life notices.

Components & Design

Component data being added…

Technical Data

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

LNG tank pressure rise due to BOG management error
Evaporator tube leakage due to thermal cycling stress
Gas valve unit (GVU) solenoid valve failure
Gasdetektionssystem Fehlalarm

Service & Maintenance

Gas detection calibration quarterly. GVU function test before each gas operation. IGF Code compliance at annual survey.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Kongsberg Maritime AS Avd. Longva: Spezialteile per Hersteller. Lead time: 4-8 Wochen. Gasdetektions-Sensoren an Bord.
Equipment Model #2049 · ✓ still in production