"> Carrier Marine & Offshore 30XBE / 30XBP - AquaForce® Fixed-Speed Air-Cooled Screw Chiller
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
Carrier Marine & Offshore

30XBE / 30XBP - AquaForce® Fixed-Speed Air-Cooled Screw Chiller

Carrier Marine & Offshore 30XBE / 30XBP - AquaForce® Fixed-Speed Air-Cooled Screw Chiller — Fixed-speed air-cooled screw chiller for marine and offshore; 30XBP premium with EC fans; extended capacity range up to 1,700 kW.

270-1700 kW
Capacity
R-134a
Medium

Inspector Detail

Common issues

  • Refrigerant leaks at flare/braze joints and schrader valves from vibration over time
  • Condenser coil fouling from salt-laden marine air reducing heat rejection
  • Compressor bearing or oil wear from refrigerant migration or low oil level
  • Fan motor or EC fan controller failure from vibration or moisture ingress
  • Low refrigerant charge from slow leaks causing high superheat and reduced capacity
  • Control system sensor drift (temperature/pressure transducers) causing erratic staging
  • Compressor short-cycling from low load or a faulty capacity control signal

Inspection checklist

  • Refrigerant leak check at all joints, valves, and compressor terminals
  • Condenser coil cleanliness and corrosion-protection coating condition
  • Compressor oil level and condition check
  • Superheat/subcooling readings checked against the unit's design values
  • Fan motor and blade condition and vibration check
  • Electrical connections and contactor condition in the control panel
  • Safety and control device function test - high/low pressure switches, flow switches
  • Refrigerant charge weight verification against the nameplate
  • Condenser fan and EC controller function test on the 30XBP variant
  • Chilled water/glycol flow rate and pressure drop across the evaporator

Service intervals

Refrigerant leak check per the applicable refrigerant-gas regulation schedule, commonly annually or more often for larger charge sizes
Condenser coil cleaning typically every 3-6 months in a marine salt-air environment, more often if visibly fouled
Compressor oil analysis typically annually or per the maker's schedule
Control and safety device function test annually or per the maker's schedule
Full service by a qualified refrigeration technician typically annually

Typical wear limits

Superheat/subcooling deviation a deviation of more than a few degrees from the unit's design superheat/subcooling commonly indicates a charge or metering fault - confirm exact figures against the unit's own commissioning data
Condenser coil coating wear renew or recoat the protective coating before base metal corrosion is exposed - inspect at each coil cleaning

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Compressor oil of the correct type for the refrigerant
  • R-134a refrigerant for top-up, sourced and handled per applicable regulations
  • Contactors/control relays
  • Pressure transducers/switches
  • Condenser fan motor
  • Filter drier core

Safety

  • Pressurized refrigerant system - risk of frostbite from liquid refrigerant contact and pressure hazards from over-pressurization
  • Electrical hazards in the control panel and compressor terminal box
  • Rotating fan blades - lock out/tag out before servicing
  • Refrigerant handling requires certified personnel and recovery equipment per applicable regulations - venting to atmosphere is not permitted

Class survey

HVAC/chiller plant is generally reviewed for correct function of safety devices (high/low pressure cut-outs) and, where accommodation cooling is class-notated, functional testing at survey; refrigerant handling and charge records should be documented per the applicable environmental regulations.

Estimated lifetime: Not typically rated in running hours - air-cooled marine chillers of this class commonly give 15-20 years of service with proper coil maintenance and refrigerant leak control; actual life is heavily influenced by salt-air corrosion protection and how well refrigerant charge is maintained.

Components & Design

Component data being added…

Technical Data

cooling capacity kW 270–1700
refrigerant R-134a
compressor Twin-rotor screw, fixed-speed
SEER LT 12 7 standard up to 4.6
SEPR HT 12 7 standard up to 5.8
SEPR HT 12 7 premium up to 6.2
refrigerant charge reduction pct 40 (via microchannel heat exchangers)
certifications Eurovent, AHRI
control SmartVu™ 4.3" display
compressor type screw fixed-speed
source manufacturer datasheet

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Refrigerant circuit integrity: check for leaks at compressor shaft seals, brazed joints, and service valves; verify refrigerant charge level and subcooling/supe

Refrigerant circuit integrity: check for leaks at compressor shaft seals, brazed joints, and service valves; verify refrigerant charge level and subcooling/superheat against published design values

Heat exchanger fouling and tube condition: inspect evaporator and condenser tubes for scaling, biofouling (seawater side) and corrosion; verify tube wall thickn

Heat exchanger fouling and tube condition: inspect evaporator and condenser tubes for scaling, biofouling (seawater side) and corrosion; verify tube wall thickness on Cu/Ni seawater-side tubes against minimum allowance

Compressor oil level, oil quality, and oil circuit: check sump level sight glass, sample oil for acid number and moisture; inspect oil filters, strainers, and h

Compressor oil level, oil quality, and oil circuit: check sump level sight glass, sample oil for acid number and moisture; inspect oil filters, strainers, and heater operation

Control system and safety devices: test all protective cut-outs (high-pressure, low-pressure, oil pressure, motor overtemperature, anti-freeze); verify setpoint

Control system and safety devices: test all protective cut-outs (high-pressure, low-pressure, oil pressure, motor overtemperature, anti-freeze); verify setpoints match original commissioning records and classification society requirements

Seawater/cooling-water flow and pump performance: measure condenser inlet/outlet temperature differential and flow rate; inspect strainer baskets, impeller wear

Seawater/cooling-water flow and pump performance: measure condenser inlet/outlet temperature differential and flow rate; inspect strainer baskets, impeller wear, and confirm pump curves within tolerance

Electrical installation and motor insulation: megger-test compressor and fan motors; check contactor condition, terminal torques, VFD cooling fans, and harmonic

Electrical installation and motor insulation: megger-test compressor and fan motors; check contactor condition, terminal torques, VFD cooling fans, and harmonic filter integrity where fitted

Structural and vibration integrity: inspect anti-vibration mounts, base-frame welds, and pipe support brackets for fatigue cracks; compare vibration signature a

Structural and vibration integrity: inspect anti-vibration mounts, base-frame welds, and pipe support brackets for fatigue cracks; compare vibration signature against baseline; check flexible hose connections

Classification-society compliance documentation: verify current type-approval certificates (ABS, DNV, BV, LR, RINA etc.) are within validity; confirm maintenanc

Classification-society compliance documentation: verify current type-approval certificates (ABS, DNV, BV, LR, RINA etc.) are within validity; confirm maintenance log records are complete for next class survey

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #152104 · ✓ still in production