OceanSphere
Engines
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 10 verified suppliers & service companies for Survitec Group in the Maritime Network Find suppliers →
Survitec Group

Zodiac USCG/SOLAS 'A' Liferaft 8-Person, Low Profile Container

Survitec Group Zodiac USCG/SOLAS 'A' Liferaft 8-Person, Low Profile Container — Commercial vessel emergency evacuation.

Inspector Detail

Common issues

  • Painter line securing point corrosion or improper lashing to the deployment cradle
  • Hydrostatic release unit (HRU) past its service life or incorrectly mounted, preventing free-float release
  • Container seal band deterioration allowing moisture ingress
  • CO2/N2 inflation cylinder valve corrosion or under-pressure found only at annual service
  • Cradle securing straps over-tightened or seized, delaying manual launch
  • UV degradation of the container GRP shell on exposed weather decks
  • Retro-reflective tape and light bracket missing or damaged after re-fit

Inspection checklist

  • Confirm annual service due date and last approved service station stamp on the container
  • Check HRU manufacture/expiry date (typically 2-year service life) and correct weak-link attachment
  • Verify painter line is free to run and secured to the ship, not seized to the cradle
  • Check cradle securing arrangement releases without tools under load
  • Inspect container for cracks, distortion, and integrity of the sealing band
  • Confirm container is stowed with correct float-free clearance and no obstruction above
  • Check that the SOLAS pack contents list and last repack date match the service certificate
  • Verify raft light bracket and float-free link are fitted and undamaged

Service intervals

Annual service at approved liferaft service station 12 months (extension up to 17 months only where permitted by flag/class)
Hydrostatic release unit (HRU) replacement per manufacturer service life, typically 2 years
Full raft condition/pressure test at each approved service, per manufacturer schedule
Container and cradle visual inspection by crew monthly

Critical spares

  • Hydrostatic release unit (weak link + HRU assembly, correct model for this container type)
  • Painter line (approved length/breaking strain for this raft size)
  • Container sealing/banding tape
  • Raft light and battery (service-station supplied)
  • Cradle securing strap/lashing set

Safety

  • CO2/N2 cylinder is pressurised; do not attempt to open or service the container onboard
  • HRU weak link must match the vessel's displacement class - wrong link can prevent release or cause premature release
  • Never stow cargo or lines over the raft that would obstruct float-free operation
  • Manual launch under load can cause crush injury if the cradle release binds

Class survey

Liferafts are surveyed against the valid approved-service-station certificate; class checks the certificate date, HRU expiry, and that container/cradle marking matches the ship's fire and safety plan. A raft found overdue for annual service is normally logged as an outstanding condition of class.

Components & Design

Component data being added…

Technical Data

capacity persons 8
SOLAS approval SOLAS A
weight kg 79
container dimensions mm 1092 x 667 x 389

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Buoyancy tube integrity and seam condition inspection (full inflation test required)

Buoyancy tube integrity and seam condition inspection (full inflation test required)

Fabric material inspection for tears, abrasion, and UV damage

Fabric material inspection for tears, abrasion, and UV damage

Relief valve function testing and pressure validation

Relief valve function testing and pressure validation

Inflation cylinder condition, pressure verification, and expiration date check

Inflation cylinder condition, pressure verification, and expiration date check

Floor-to-tube seam inspection (especially for rafts over 10 years of service; seam slippage and edge lifting detection)

Floor-to-tube seam inspection (especially for rafts over 10 years of service; seam slippage and edge lifting detection)

Pressure Resistance and Adhesion (NAP) test on seams and fabric at 11-year mark and annually thereafter

Pressure Resistance and Adhesion (NAP) test on seams and fabric at 11-year mark and annually thereafter

Equipment completeness verification against SOLAS packing list (pyrotechnics, drinking water, food rations, first aid kit, sea anchor, paddles, repair kit, sign

Equipment completeness verification against SOLAS packing list (pyrotechnics, drinking water, food rations, first aid kit, sea anchor, paddles, repair kit, signaling mirrors, fishing kit)

Pyrotechnic expiration date validation and replacement of expired items (flares, smoke signals)

Pyrotechnic expiration date validation and replacement of expired items (flares, smoke signals)

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #151460 · ✓ still in production