OceanSphere
Engines
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 2 verified suppliers & service companies for Ruhrpumpen in the Maritime Network Find suppliers →
Ruhrpumpen

LSS

Ruhrpumpen LSS — Deepwell cargo pumping for inland and ATB (Articulated Tug Barge) applications, handling viscous cargo from light #2 oil to asphalt.

Components & Design

Component data being added…

Technical Data

pressure psi 100
pressure bar 6.89
viscosity cSt 2000
deepwell diameter inch 24
pump type Vertical positive displacement

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Mechanical shaft seal condition inspection via purging connections (nitrogen/air purging) for cargo/oil or lubricating oil leakage detection

Mechanical shaft seal condition inspection via purging connections (nitrogen/air purging) for cargo/oil or lubricating oil leakage detection

Oil level monitoring in seal system pressure vessel and sealing fluid condition assessment

Oil level monitoring in seal system pressure vessel and sealing fluid condition assessment

Bearing and wear ring lubrication status verification (bearings cooled/lubricated by pumped cargo - critical for dry-run prevention)

Bearing and wear ring lubrication status verification (bearings cooled/lubricated by pumped cargo - critical for dry-run prevention)

Vibration, noise, and motor load analysis for early indication of developing equipment issues

Vibration, noise, and motor load analysis for early indication of developing equipment issues

Discharge and suction pressure monitoring, flow rate verification, and temperature trending

Discharge and suction pressure monitoring, flow rate verification, and temperature trending

Cavitation risk assessment, particularly during final discharge stages with boiling-point cargoes

Cavitation risk assessment, particularly during final discharge stages with boiling-point cargoes

Electric motor condition (cold/warm start cycle limits, 1-hour mandatory rest period between restart attempts)

Electric motor condition (cold/warm start cycle limits, 1-hour mandatory rest period between restart attempts)

Intermediate shaft bearing positions and alignment verification along piping column assembly

Intermediate shaft bearing positions and alignment verification along piping column assembly

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #151126 · ✓ still in production

Wer liefert dieses Teil? 1 Betriebe im Verzeichnis

RUHRPUMPEN (CHINA) Co.,LTD
China
Alle Betriebe für Ruhrpumpen ansehen →