OceanSphere
Engines
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
Neuman & Esser

1TZS190

Neuman & Esser 1TZS190 — Hydrogen fuel gas compressor.

Components & Design

Component data being added…

Technical Data

Power Rating 629 kW (843 HP / 900 HP)
Operating Speed 504 RPM
Capacity 13155 Nm³/h (7742 SCFM)
Suction Pressure 4 bar (58 psi)
Discharge Pressure 12.9 bar (187-201 PSIA)
Stroke 210 mm
Weight 14700 kg (32320 lbs)
Dimensions 106" x 14'4" x 80" HIGH

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Piston ring wear and seal degradation

Visually inspect piston rings for wear grooves; measure radial and axial clearances with feeler gauges every 6000 running hours. Replace if remaining step cut overlap is 1/3 or less of full overlap. Check discharge gas temperature for early sign of leaking piston rings.

Discharge and suction valve condition (most common efficiency loss)

Remove and dismantle suction/discharge valves for inspection; check sealing surfaces for wear using valve plate testing. Carbonized valves indicate oil carryover. Replace worn valve plates immediately; do not reuse. Test relief valve opening pressure with hydraulic tester.

Cylinder pressure imbalance and rod runout

Record cylinder pressure profiles for all stages; measure rod runout with dial indicator at stroke extremes (max deviation ±0.00015 mm/mm of stroke or 0.064 mm absolute per API 618). Perform 4-hour unloaded mechanical running test at rated speed; record bearing temperatures, vibration amplitudes, and lube oil viscosity.

Bearing wear and crankcase contamination

Measure bearing clearances with precision gauges and record all readings. Inspect crankcase interior thoroughly with lint-free cloth for metal particles and sludge. Gauge major components (piston, liner, rod, crosshead bearing); replace if outside tolerance. Renew piston rings, gudgeon pin, and top-end bearing as preventive measure.

Cooling system blockage and temperature deviation

Monitor cooling water inlet and outlet temperatures continuously (target rise: 10-15°C). Check inlet pressure (0.07-0.3 MPa) and flow rate (1-2 m/s). Inspect intercooler and jacket passages for scale/blockage. Drain condensate from intercoolers every 8-24 hours via automatic drain valve. Verify cooling pump belt and impeller condition. Check expansion tank water level.

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #150011 · ✓ still in production

Need spare parts for this model?

Tell us what you need for this model — we obtain the quotations for you.

Request spare parts →