"> Grundfos CRE 3
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 7 verified suppliers & service companies for Grundfos in the Maritime Network Find suppliers →
Grundfos

CRE 3

Grundfos CRE 3 — Freshwater cooling with VFD, stainless steel multistage.

Grundfos CRE 3

Components & Design

Component data being added…

Technical Data

Material Cast iron, stainless steel internals
VFD Integrated variable frequency drive and controller
Energy Saving Automatic speed adjustment based on demand
Applications Cooling, air-conditioning systems

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Korrosion in See-/Brackwassersystemen - Verprüfung der Materialspezifikation (Titanium CRT vs. Stainless Steel CRN vs. Standard Cast Iron CR)

Check material certificate and surface finish; verify titanium marking on CRT type plate; confirm corrosion resistance against ASTM seawater standards

Seal and bearing wear at high temperatures (up to 180°C for CRN with Air-Cooled-Seal) - inspection requirement under thermal load

Verify seal type (mechanical vs. air-cooled); perform thermometer reading; check wear pattern on bearings and seal; review service intervals

Cavitation risk and pressure fluctuations in ship cooling systems - verification of NPSH requirements and pressure relief valves

Perform suction-side pressure measurement; compare NPSH availability with operating condition; check pressure relief valve function; verify cavitation noise/vibration at various speeds

VFD integration errors and electronics failure risk in CRTE/CRE/CRNE variants with variable frequency

Check VFD firmware version; validate sensor function (pressure, temperature, flow); check power supply voltage and frequency; monitor alarm/error code logging

Wear of back-pullout bearings and shaft seal in NK series (long service intervals between inspections)

Check shaft runout with dial indicator (max. 0.1-0.2 mm); verify bearing clearance with lubricant control; measure shaft axial displacement before/after 100 operating hours

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #144884 · ✓ still in production

Wer liefert dieses Teil? 23 Betriebe im Verzeichnis · 9 aus Herstellerlisten

COMID S.r.l.
Torre del Greco (NA), Italy
✓ autorisiert
Auramarine Ltd
Turku, Finland
AxFlow
United Kingdom
Baltic Water GmbH
Winsen, Germany
CRYSTAL FLOW LLC
Canada
Cochran Ltd
Annan, United Kingdom
DeFraWater GmbH
Seevetal-Hittfeld, Germany
EUROELEKTRO MARINE SP. Z O.O.
Rumia, Poland
Fluid Global Solutions S.r.l.
Arcola, Italy
Grundfos Pumps (Shanghai) Co Ltd
Denmark
Grundfos Water Treatment S.r.l.
Bologna, Italy
HUAT HOE MACHINERY & TRADING PTE LTD
Singapore, Singapore
Weitere aus Hersteller- und Marktplatzverzeichnissen:
Aquality · NetherlandsDallaserra Ridderkerk Spares BV · NetherlandsFerrier Pump Supplies Ltd · United KingdomGRUNDFOS (UK) · United KingdomNeptune Venice srl · ItalyNovenco Marine & Offshore A/S · DenmarkRCG USA · United StatesS.S.G. Shipping Services BV · NetherlandsSource Atlantic Limited · Canada
Alle Betriebe für Grundfos ansehen →