"> Houttuin (Colfax/CIRCOR) Houttuin 211.10
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 1 verified suppliers & service companies for Houttuin (Colfax/CIRCOR) in the Maritime Network Find suppliers →
Houttuin (Colfax/CIRCOR)

Houttuin 211.10

Houttuin (Colfax/CIRCOR) Houttuin 211.10 — Marine lube oil, vertical pump configuration.

Components & Design

Component data being added…

Technical Data

Max Capacity 600 m³/h
Max Pressure 16 bar
Max Temperature 80°C
Viscosity Range 10-760 cSt
Type Twin-screw pump
Configuration Vertical mounting

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

Mechanical seal degradation or leakage

Monthly inspection of seal faces for surface roughness exceeding Ra 0.8μm, visible scoring, corrosion pitting, and leakage rate. Check springs for >15% compression loss or corrosion. For marine saltwater environments, verify electropolished 304-grade stainless steel material. Accept minor imperfections <0.05mm depth only (polish out), deeper damage requires shaft sleeve and seal renewal.

Bearing wear and failure - noise/vibration/temperature increase

Quarterly monitoring of bearing condition via vibration analysis (compare to baseline), bearing housing temperature (target <80°C for normal operation), audible noise (grinding, squealing indicates wear), and lubricant oil samples for metal wear particles. Use thermocouples for direct bearing outer ring temperature measurement. Premature failure typically caused by lubrication starvation, contamination, or misalignment - check bearing clearances and shaft alignment within 0.1mm on coupling concentricity.

Rotor/screw internal wear and corrosion pitting

Yearly inspection of internal screw and casing clearances: rotor-to-bore maximum 0.2mm, between rotor flanks maximum 0.4mm. Use borescope or remove inspection covers to check for internal scratches, scoring, or corrosion pitting. Casing material examination for stress corrosion cracking in cemented carbide components. Complete overhaul required not exceeding 3 years. Discard rotors with scoring exceeding 0.2mm depth.

Suction line blockage and cavitation - low flow/high noise

Check strainer and inlet screen monthly by monitoring suction pressure reduction (gradual drops indicate clogging). Verify suction piping for blockages, air leaks into suction line, and adequate net positive suction head (NPSH). Prime pump completely with working liquid before startup. Inlet pressure must not exceed 25-75 PSIG depending on pump type. Cavitation creates vapor bubbles causing noise, vibration, and rotor/impeller damage - verify pump inlet pressure at <6 bar (self-priming design requirement).

Coupling misalignment and shaft seal leakage

Pre-installation: verify pump and motor shaft concentricity within 0.1mm on coupling outer circle, maintain 2-4mm gap between coupling planes (0.3mm tolerance). Post-installation: periodic inspection of foundation bolts torque, coupling wear, and shaft seal integrity (leakage should not exceed 10 drops per hour). Rotate pump-motor coupling by hand to confirm smooth operation. Any resistance or grinding indicates internal bearing damage. Replace shaft seals if leakage is excessive.

Type-general inspection and maintenance points for this equipment category — not model-specific.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →
Equipment Model #143837 · ✓ still in production

Wer liefert dieses Teil? 6 Betriebe im Verzeichnis · 75 aus Herstellerlisten

Ferrier Pumps Ltd
Crutherland, United Kingdom
✓ autorisiert
Henry R Ayton Ltd
Ireland
✓ autorisiert
SOGECO
Nouakchott, Mauritania
✓ autorisiert
TSS Rotterdam B.V.
Rotterdam, Netherlands
CIRCOR ALLWEILER GmbH
Radolfzell, Germany
Roodhart Marine & Offshore Services
Rotterdam, Netherlands
Weitere aus Hersteller- und Marktplatzverzeichnissen:
A&P Internacional S.A.C · PeruA.Rada GmbH · AustriaAS Filter · EstoniaASIF AZIM ASSOCIATES · PakistanAero Tech India · IndiaAirways Industrial Systems · IndiaAl-Omda Technical Company W.L.L. · QatarAllweiler GmbH (Marine) · BelgiumAltec s.r.o. · SlovakiaAltecon s.r.o. · Czech RepublicArgus Makine Ekipmani San. Tic. Ltd. Sti. Industry · IstanbulAxflow A/S · Denmark
Alle Betriebe für Houttuin (Colfax/CIRCOR) ansehen →