OceanSphere
Engines
⚓ Working on this equipment?
Ask the AI troubleshooter, log your hours on board and turn them into invoice-ready service reports — for this exact model.
Start free — 14 days →
No credit card required
🔧 1 verified suppliers & service companies for Global Davit GmbH in the Maritime Network Find suppliers →
Global Davit GmbH

HRN.28LT

The Global Davit GmbH HRN.28LT is a deck‑mounted davit system for launching and recovering lifeboats or rescue rafts, featuring a high load capacity and compliance with IMO SOLAS requirements.

Global Davit GmbH HRN.28LT
Persons capacity per SOLAS certification
Capacity
Crew Evacuation / Safety
Medium

Inspector Detail

Common issues

  • Wire rope corrosion, broken wires or birdcaging on the falls
  • Winch brake lining wear reducing holding capacity
  • Grease starvation at sheaves and pivot points increasing operating friction
  • Limit switch / end-of-travel switch drift causing overrun
  • Hydraulic cylinder seal leakage on hydraulic davit arms
  • Structural corrosion at the davit foot/pivot pin area exposed to weather
  • Remote or local control station wiring and push-button faults

Inspection checklist

  • Visual inspection of wire falls for broken wires, corrosion, kinks
  • Winch brake holding test against rated load per LSA Code requirement
  • Function test raising/lowering at full speed and creep speed
  • Check limit switches and interlocks operate correctly
  • Inspect hydraulic hoses/cylinders for leaks (hydraulic type)
  • Check pivot pins, bushings and greasing points
  • Inspect structural welds and foundation bolts for corrosion or cracking
  • Confirm on-load release gear (if fitted) operates and resets correctly

Service intervals

Visual/operational check monthly (SOLAS drill requirement)
Winch brake load test annually
Wire fall renewal typically every 5 years or per maker's manual/condition
Full davit overhaul incl. dynamic winch test every 5 years (LSA Code periodic servicing)
On-load release gear operational test every 5 years, with 1-year interim thorough examination

Typical wear limits

Wire rope broken wires condemn per an applicable wire rope discard standard (e.g. ISO 4309) - no fixed percentage without inspection
Brake lining thickness renew before reaching the maker's stated minimum thickness

Ranges are typical for this design class. Always confirm against the manufacturer documentation for your serial number.

Critical spares

  • Wire rope falls (matched set)
  • Winch brake linings
  • Limit switch assembly
  • Hydraulic cylinder seal kit (if hydraulic)
  • Sheave bearings

Safety

  • Suspended load hazard during lowering/raising - keep personnel clear of the fall of the wire
  • Stored hydraulic pressure in cylinders - isolate before maintenance
  • Brake failure risk if linings are worn beyond limits - do not load-test until verified
  • Working aloft/at height on the davit structure

Class survey

LSA Code requires annual thorough examination and load test of the winch brake, plus 5-yearly overhaul including a dynamic winch test to 1.1x SWL and static structural test to 2.2x SWL (or per maker's approved schedule). Records of these tests are checked at Annual and Renewal Survey.

Estimated lifetime: Davits are not rated in running hours; they are cycle/load-tested. Design service life is typically 20-25 years, subject to LSA Code annual thorough examination and 5-year overhaul - condition-based, not hour-based.

Components & Design

Component data being added…

Technical Data

imo approved True

🤖 Ask about this model

One free question — answered like a marine engineer. No account needed.

Common failures & inspection points

On-Load-Release-Gear (OLRG)

Annual functional test at 1.1 × SWL; after test check locking; inspect for dried paint/contamination/corrosion in lock, thread/shank wear/cracks. 5-year dynamic test. SOLAS III / MSC.402(96).

Drahtseile (Falls/Wire Ropes)

Inspect for kinks, corrosion, strand breakage (>10% over 8d length = replacement), inaccessible sections; correct/certified ropes; if required turn for full inspection; renewal per manufacturer interval.

Bremse (Zentrifugal- + Haltebremse)

Brake pad wear; check lowering speed (SOLAS S=0.4+0.02H, max ~36 m/min); remote release function; brake not blocked by poor maintenance.

Korrosion der Davit-Struktur

Galvanized structure + stainless steel fasteners for pitting/discoloration; NDT of load-bearing structure for cracks; incident RRS Sir David Attenborough 2021 (severe corrosion due to poor maintenance).

Wartungs-Compliance

Planned maintenance complete since installation? Annual + 5-year tests recorded in logbook; manufacturer instructions followed; only authorized personnel (MSC.1/Circ.1205 Rev.1).

Type-general inspection and maintenance points for this equipment category — not model-specific.

Service & Maintenance

Engine test weekly (min. 5 min). Release hook maintenance annually by approved service (SOLAS MSC.402(96)). GRP hull inspection at docking. 5-year basic survey.

Suppliers & Spare Parts

Direct links to manufacturer, datasheet, spare-parts portal and dealers — request access below.

📄 Request sourcing links & documents
🛠 Manage this equipment in your fleet

Cases, daily reports, timesheets and AI troubleshooting in the OceanSphere Marine app — free for 14 days.

Start free trial →
🔎 Suppliers & service for this equipment

Find manufacturers, repair shops and spare-part dealers in the Maritime Network — our global company directory.

Maritime Network →

Replacement Parts

Spare parts via Global Davit GmbH or authorized distribution partners. Lead time: 2–6 weeks.

DNV type approval

Verified against the DNV Approval Finder — the certificate below is issued by DNV, not by us.

Certificate
MEDB0000C0W
Approved as
Release mechanism for: - lifeboats and rescue boats (launched by a fall or falls)
Certificate holder
Global Davit GmbH (Germany)
Valid until
2031-01-26
Open the certificate at DNV →
Equipment Model #10578 · ✓ still in production